# The Control of Pollution (Silage, Slurry and Agricultural Fuel Oil) Regulations 1991, Regulation 11: Notice of construction etc.

Extent: E+W

A person who proposes to have custody or control of any relevant substance which is to be kept or stored on a farm in a silo, slurry storage system or, as the case may be, fuel storage area constructed, substantially enlarged or substantially reconstructed on or after I st September 1991 shall serve notice on the Authority specifying the type of structure to be used and its location at least 14 days before it is to be used for such keeping or storage.

---