Paragraph 5

Original text. Later amendments are not shown.

(1)

Any facilities used for the temporary storage of slurry before it is transferred to a slurry storage tank shall have adequate capacity to store the maximum quantity of slurry which (disregarding any slurry which will be transferred directly into a slurry storage tank) is likely to be produced on the premises in any two day period.

(2)

Where slurry flows into a channel before discharging into a reception pit and the flow of slurry out of the channel is controlled by means of a sluice, the capacity of the reception pit shall be adequate to store the maximum quantity of slurry which can be released by opening the sluice.