{
  "url": "https://openlegislation.uk/cory-decarbonisation-project-order-2025/schedule-16",
  "json_url": "https://openlegislation.uk/cory-decarbonisation-project-order-2025/schedule-16.json",
  "legislation": "uksi/2025/1227",
  "legislation_title": "The Cory Decarbonisation Project Order 2025",
  "legislation_url": "https://openlegislation.uk/cory-decarbonisation-project-order-2025",
  "path": "schedule/16",
  "kind": "schedule",
  "number": "16",
  "heading": "DESIGN PARAMETERS",
  "text": "(1)\nComponent/Building/Area\n(2)\nWorks Area\n(3)\nMaximum Number\n(4)\nMaximum Height (m) of Component/ Building/ Area\n(5)\nMaximum Height (m)\n(6)\nFurther Parameters\nDirect Contact Cooler\n1A\n2\n30\n33 Above Ordnance Datum\n-\nAbsorber Column(s) and Stack(s)\n1B\n2 combined Absorber Columns and Stacks or a maximum of 2 Absorber Columns and 2 Stacks\n110\n113 Above Ordnance Datum\nMinimum vertical distance between top of Absorber Column(s) and top of Stack(s) whether combined or separate – 30m\nMinimum height of the top of Stack(s) – 100m from development platform as built\nWhere there are 2 Stacks: Maximum internal diameter of Stack associated with Riverside 1: 3.1m\nMaximum internal diameter of Stack associated with Riverside 2: 2.5m\nWhere there is 1 Stack: Maximum internal diameter of Stack: 4.0m\nRegenerator\n1A\n2\n60\n63 Above Ordnance Datum\n-\nCompression Plant\n1C\n2\n45\n48 Above Ordnance Datum\n-\nCO2 Dehydration\n1C\n2\n25\n28 Above Ordnance Datum\n-\nCO2 Liquefaction\n1C\n2\n30\n33 Above Ordnance Datum\n-\nCO2 Vents\n1C\n2\n45\n48 Above Ordnance Datum\n-\nLCO₂ Buffer Storage Area\n1D\n16\n45\n48 Above Ordnance Datum\n-\nHybrid or Dry Cooling Tower\n1E\n2\n32\n35 Above Ordnance Datum\n-\nWater Treatment Plant and Wastewater Treatment Plant\n1E\n2\n20\n23 Above Ordnance Datum\n-\nBack Pressure Turbine and Generator\n1A\n2\n35\n38 Above Ordnance Datum\n-\nInsulated heat pipework and flue gas ducting\n2A(ii) and 2b(i)\n-\n30\n33 Above Ordnance Datum\n-\nLoading platform (not including topside infrastructure and equipment)\n4C\n1\n-\n11.5 Above Chart Datum\nMaximum length of 40 metres\nMaximum width of 50 metres\nBreasting Dolphins\n4B\n4\n-\n11.5 Above Chart Datum\n-\nMooring Dolphins\n4B\n6\n-\n11.5 Above Chart Datum\nMaximum length of 7 metres\nMaximum width of 7 metres\nAccess Trestle Start Point (not including topside infrastructure and equipment)\n4B\n1\n-\n20 Above Ordnance Datum\nMaximum length of 335 metres\nMaximum width of 10 metres\nLCO2 pipelines, piperacks and pipe bridges\n5\n-\n30\n33 Above Ordnance Datum\n-",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 16 in force at 27.11.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1227/schedule/16",
    "retrieved_at": "2026-10-28T21:09:19.424447+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}