  "heading": "Control of noise during operation",
  "text": "(1) Prior to commissioning of any part of Work No. 1, a written noise mitigation plan must be submitted to and approved by the relevant planning authority in writing which demonstrates how the maximum permitted limit set out in columns (2) and (3) of the below table will be achieved at the locations set out in column (1) of the below table, during operation of Work No. 1.\n(1)\nLocation\n(2)\nDay-time Operational Noise Limit\nLAr, Tr dB\n(3)\nNight-time Operational Noise Limit\nLAr, Tr dB\nClydesdale Way\n54\n49\nTravelodge London Belvedere Hotel\n54\n49\n(2) The undertaker must operate the authorised development in accordance with the approved noise mitigation plan, except—\n(a) in the case of an emergency (as defined in the noise mitigation plan); or\n(b) with the prior approval of the relevant planning authority.\n(3) Where the level of noise at a monitoring location exceeds the maximum permitted level specified for that location in sub-paragraph (1) because of an emergency—\n(a) the undertaker must, as soon as possible and in any event within two business days of the beginning of the emergency, submit to the relevant planning authority a statement detailing—\n(i) the nature of the emergency;\n(ii) why it is necessary for the level of noise to have exceeded the maximum permitted level; and\n(b) if the undertaker expects the emergency to last for more than 24 hours, it must inform local residents and businesses affected by the level of noise at that location of—\n(i) the reasons for the emergency; and\n(ii) how long it expects the emergency to last.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 20 in force at 27.11.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1227/schedule/2/paragraph/20",
    "retrieved_at": "2026-10-28T21:09:19.424447+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}