# The Cory Decarbonisation Project Order 2025, Paragraph 1: Interpretation

Extent: E+W

In this Schedule—
“utility works” means works to install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain underground electrical cables, earthing cable, optical fibre cable, data cable, telecommunications cable, flue gas pipework, condensate pipework, water supply pipework, foul water pipework, drains, sewers, heat pipes, LCO₂ pipework, and other apparatus and services, and associated works including bays, ducts, protection and safety measures and equipment, and other apparatus and structures.
(1)
Area
(2)
Streets subject to street works
(3)
Description of the street works
London Borough of Bexley
Norman Road
Utility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point E to point L.
London Borough of Bexley
Norman Road
Utility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point L to point O.
London Borough of Bexley
Norman Road
Utility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point L to point P.
London Borough of Bexley
A2016 Picardy Manorway
Utility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point O to point N.
London Borough of Bexley
A2016 Picardy Manorway
Utility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point P to point Q.

---
Source: https://www.legislation.gov.uk/uksi/2025/1227/schedule/4/paragraph/1 (the official version)
Page: https://openlegislation.uk/cory-decarbonisation-project-order-2025/schedule-4/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

