# The Cory Decarbonisation Project Order 2025, Part 2: AUTHORISING TEMPORARY USE OF VEHICULAR USE ON PUBLIC RIGHTS OF WAY

Extent: E+W

(1)
Area
(2)
Public right of way
(3)
Measures
London Borough of Bexley
Footpath 1
Motor vehicles authorised by the undertaker may pass along, or cross, the length of the public right of way between the points marked M and S on the access and rights of way plan shown with a yellow dashed line
London Borough of Bexley
Footpath 2
Motor vehicles authorised by the undertaker may pass along, or cross, the length of the public right of way between the points marked R and H, between the points H and L and between the points marked R and S on the access and rights of way plan shown with a purple dashed line.
London Borough of Bexley
Footpath 3
Motor vehicles authorised by the undertaker may pass along, or cross, the length of the public right of way between the points marked A and T on the access and rights of way plan shown with an orange dashed line.
London Borough of Bexley
Footpath 4
Motor vehicles authorised by the undertaker may pass along, or cross, the length of the public right of way between the points marked C and F on the access and rights of way plan shown with a green dashed line.

---
Source: https://www.legislation.gov.uk/uksi/2025/1227/schedule/7/part/2 (the official version)