# The Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008 Confirmation Instrument 200, Schedule THE


The Council of the City of Wakefield (hereinafter referred to as “the Council” makes this Scheme in exercise of their powers under section 106(3) of the Highways Act 1980 and all other powers enabling them in that behalf.
1. The Council are authorised to construct over the navigable waters of the River Calder the footbridge specified in the Schedule to this Scheme as part of the highway which is to be constructed between Thornes Lane and the Hepworth Gallery in the Metropolitan District of Wakefield.
2. The Scheme may be cited as the Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008.

---
Source: https://www.legislation.gov.uk/uksi/2008/2988/schedule (the official version)
Page: https://openlegislation.uk/council-of-the-city-of-wakefield-wakefield-waterfront-hepworth-gallery-footbridge-scheme-2008-confirmation-instrument-200/schedule
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

