Paragraph 2
Points of Commencement and Termination — From a point on the south-westerly flood bank of the River Clwyd approximately 275 metres north-west of the existing A525 road bridge and over the river to a point on the north-easterly flood bank approximately 285 metres north-west of the existing bridge.