OpenLegislation

Part SCHEDULE TO THE SCHEME PLANS AND SPECIFICATION OF THE NEWLAND BRIDGE

Original text. Later amendments are not shown.

The location and the general design of the bridge areshown on the general arrangement plan numbered 100/B/89/501C annexedhereto.

The bridge will cross the River Aire generally on the alignmentof the dismantled single span railway bridge.