Part SCHEDULE TO THE SCHEME PLANS AND SPECIFICATION OF THE NEWLAND BRIDGE
The location and the general design of the bridge areshown on the general arrangement plan numbered 100/B/89/501C annexedhereto.
The bridge will cross the River Aire generally on the alignmentof the dismantled single span railway bridge.