# The County Council of Humberside (River Hull Bridge) Scheme 1994 Confirmation Instrument 1995, HEADWAY


When raised, each deck will be pivoted to a vertical position on the west bank completely clear of the river.
When lowered, each deck will have a headway of 1.5 metres above High Water Ordinary Spring Tides, when the depth of the water is 3.5 metres above Ordnance Datum Newlyn.

---