Schedule THE SCHEDULE TO THE SCHEME PLANS AND SPECIFICATIONS OF THE BLAKES BRIDGE RECONSTRUCTION READING

Original text. Later amendments are not shown.

The site and general design of the Bridge are shown on plan numbered 7009/41, annexed hereto.

Points of Commencement and Termination

From the point on the south bank of the River Kennet, Map reference 4722153.70 east, 173471.40 north.

To a point on the north bank of the River Kennet, Map reference 472151.30 east, 173490.20 north.

All on Ordnance Sheet SU 7273 SW.

Overall Dimensions

The bridge will be 21.6 metres wide overall and will carry dual carriageways of 7.3 metres width each with a central reserve of 2.0 metres and footings of 2.5 metres width on east and west sides. It will have an overall length of 20.0 metres.

Main Navigation Span

Single span of 18.85 metres over the River Kennet.

Headway

2.33 metres minimum.

Waterway

Minimum square waterway of 16 metres.