Paragraph 1
Subject to the provisions of this Schedule and of paragraph 7 of this Scheme, the amount of any grant payable under this Scheme towards the approved cost of any operation specified in column 1 of this Schedule shall not exceed a sum equal to the percentage of that cost specified in relation to that operation in column 2 of this Schedule.
| Column 1 | Column 2 |
|---|---|
| OPERATION | PERCENTAGE OF APPROVED COST |
| 1. Erection or improvement of agricultural buildings and associated works. | 50% |
| 2. Improvement of land by reclamation, regeneration, re-seeding, laying down to permanent pasture or reconditioning. | 70% |
| 3. Formation or improvement of access tracks to land improvement areas. | 70% |
| 4. Field drainage including under drainage, hill drainage and ditching. | 65% |
| 5. Arterial drainage. | 65% |
| 6. Bracken control. | 60% |
| 7. Provision or improvement of silos (excluding grain silos). | 60% |
| 8. Provision or improvement of facilities for the sheltering and/or feeding of out-wintered livestock. | 60% |
| 9. Provision or improvement of equipment for the handling and treatment of livestock. | 60% |
| 10. Provision of fences hedges, walls, gates, or cattle-grids. | 55% |
| 11. Planting of shelter belts. | 85% |
| 12. Provision or improvement of water supplies. | 60% |
| 13. Provision or improvement of a mains electricity connection or supply. | 50% |
| 14. Supply and installation of an electricity generator. | 50% |
| 15. Provision of a gas supply. | 50% |
| 16. Provision of electrical equipment. | 60% |
| 17. Provision or improvement of roads, bridges, culverts or boat slips. | 60% |