  "text": "In the London Borough of Hillingdon–\nWork No. 3/10– A railway (1,486 metres in length) commencing by a junction with the Reading Railway at a point 16 metres west of the bridge carrying that railway over the Colnbrook branch line (the former Staines and West Drayton Railway), passing eastwards and terminating by a junction with the Reading Railway at a point 40 metres east of the existing bridge carrying Kingston Lane over that railway;\nWork No. 3/10A– A railway (640 metres in length) forming a siding within West Drayton Yard commencing by a junction with Work No. 3/10 at a point 103 metres west of the bridge carrying the Reading Railway over High Street, passing westwards and terminating at a point 113 metres north of the western end of Fairway Avenue;\nWork No. 3/10B– A railway (625 metres in length) forming sidings within West Drayton Yard commencing by a junction with Work No. 3/10 at a point 103 metres west of the bridge carrying the Reading Railway over High Street, passing westwards and terminating at a point 166 metres north of the western end of Fairway Avenue;\nWork No. 3/10C– An access road in the West Drayton Yard commencing in that Yard at a point 124 metres north-west of the junction of Fairway Close with Fairway Avenue and terminating in the existing access road leading from High Street at a point 77 metres south-east of the junction of Winnock Road with Tavistock Road. Work No. 3/10C includes a level crossing of the Colnbrook branch line (the former Staines and West Drayton Railway) and a bridge over Fray's River;\nWork No. 3/10D– A realignment of an existing culvert in the West Drayton Yard, commencing at a point 315 metres north-west of the junction of Fairway Close with Fairway Avenue and terminating at a point 187 metres north of that road junction. Work No. 3/10D includes an inspection chamber;\nWork No. 3/10E– A diversion of the Colne Valley Sewer commencing by a junction with that sewer beneath a point 155 metres west of the junction of Padcroft Road with Tavistock Road and terminating by a junction with that sewer beneath a point 190 metres south of the junction of Wimpole Road with Tavistock Road. Work No. 3/10E includes shafts for construction and maintenance;\nWork No. 3/10F– A bridge, incorporating steps and ramp facilities, to carry the footpath and cycleway between Kingston Lane and Horton Bridge Road over the Reading Railway, commencing at a point 145 metres north-east of the junction of Ruffle Close with Kingston Lane and terminating at a point 192 metres south of the junction of Horton Bridge Road with Horton Road. Work No. 3/10F includes the removal of the existing bridge carrying Kingston Lane over the Reading Railway;\nWork No. 3/11– A railway (2,800 metres in length) commencing by a junction with the Heathrow Express Railway at a point 171 metres north of the northern tunnel portal of that railway, passing northwards then eastwards and terminating by a junction with the Reading Railway at a point 243 metres west of the bridge carrying The Parkway over that railway. Work No. 3/11 includes a viaduct adjacent to the Stockley Flyover;\nWork No. 3/12A– A realignment of the Heathrow Express Railway (377 metres in length) commencing by a junction with that railway at a point 148 metres north of the northern tunnel portal of that railway, passing northwards and terminating by a junction with that railway at a point 336 metres north-west of the junction of Conway Drive with Stormont Drive;\nWork No. 3/12B– A realignment of the Heathrow Express Railway (308 metres in length) commencing by a junction with Work No. 3/12A at a point 200 metres north of the northern tunnel portal of that railway, passing northwards and terminating by a junction with that railway at a point 336 metres north-west of the junction of Conway Drive with Stormont Drive;\nWork No. 3/13A– A realignment of the Reading Railway (975 metres in length) commencing by a junction with that railway at a point 100 metres north of the junction of Conway Drive with Stormont Drive, passing eastwards and terminating by a junction with that railway at a point 162 metres east of the bridge carrying Dawley Road over that railway;\nWork No. 3/13B– A railway (721 metres in length and partly on the viaduct forming part of Work No. 3/11) commencing by a junction with Work No. 3/11 on that viaduct at a point 170 metres north-east of the junction of Conway Drive with Stormont Drive, passing eastwards and terminating by a junction with the Reading Railway at a point 64 metres east of the bridge carrying Dawley Road over that railway;\nWork No. 3/13C– A railway (419 metres in length) commencing by a junction with the Heathrow Express Railway at a point 86 metres north of the junction of Conway Drive with Stormont Drive, passing eastwards and terminating by a junction with Work No. 3/13A at a point 55 metres north-east of the northern end of Burnham Gardens;\nWork No. 3/13D– A realignment of the Reading Railway (385 metres in length) commencing by a junction with that railway at a point 104 metres north of the junction of Conway Drive with Stormont Drive, passing eastwards and terminating by a junction with that railway at a point 52 metres north of the northern end of Burnham Gardens;\nWork No. 3/14– A bridge to carry a footpath and cycleway over the Reading Railway commencing at a point 23 metres south of the junction of Iron Bridge Road South with Old Stockley Road and terminating at a point 59 metres north of the junction of Old Stockley Road with Stockley Road. Work No. 3/14 includes the removal of the existing Old Stockley Road Bridge;\nWork No. 3/15A– A temporary bridge to carry Station Road over the Reading Railway at Hayes and Harlington Station (during the construction of Work No. 3/15B) commencing at a point 4 metres north-east of the junction of Keith Road with Station Road and terminating at a point 54 metres south-east of the junction of Blyth Road with Clayton Road;\nWork No. 3/15B– A raising and lengthening at the north-eastern end of the bridge carrying Station Road over the Reading Railway at Hayes and Harlington Station commencing at a point 111 metres north-east of the junction of Keith Road with Station Road and terminating at a point 54 metres south-east of the junction of Blyth Road with Clayton Road;",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukpga/2008/18/schedule/1/paragraph/wrapper41n1",
    "retrieved_at": "2026-10-29T09:11:51.049540+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}