# Crossrail Act 2008, Paragraph


In the London Borough of Hammersmith & Fulham–
Work No. 3/19A– A railway (610 metres in length) commencing by a junction with Works Nos. 3/19B and 3/19C at a point 316 metres south-east of the junction of Salter Street with Hythe Road, passing north-westwards and terminating within a proposed depot at a point 196 metres east of the bridge carrying Old Oak Common Lane over the North London Line railway. Work No. 3/19A includes a depot building;
Work No. 3/19B– A railway (838 metres in length), forming sidings within Old Oak Common depot, commencing by a junction with Works Nos. 3/19A and 3/19C at its commencement, passing westwards and terminating at a point 838 metres west of its commencement. Work No. 3/19B includes a depot building;

---
Source: https://www.legislation.gov.uk/ukpga/2008/18/schedule/1/paragraph/wrapper43n1 (the official version)
Page: https://openlegislation.uk/crossrail-act-2008/schedule-1/paragraph-wrapper43n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

