# Crossrail Act 2008, Paragraph


In the London Boroughs of Newham and Greenwich–
Work No. 1/6A– A railway (3,579 metres in length, in tunnel) commencing by a junction with Work No. 1/5 at its termination, continuing south-eastwards beneath the River Thames, continuing eastwards and terminating at a point 157 metres north-west of the junction of Marmadon Road with Church Manor Way;
Work No. 1/6B– A railway (3,586 metres in length, in tunnel) commencing by a junction with Work No. 1/5 at its termination, continuing south-eastwards beneath the River Thames, continuing eastwards and terminating at a point 156 metres north-west of the junction of Marmadon Road with Church Manor Way;
Works Nos. 1/6A and 1/6B include shafts at Warren Lane, Arsenal Way and Plumstead;

---
Source: https://www.legislation.gov.uk/ukpga/2008/18/schedule/1/paragraph/wrapper6n1 (the official version)
Page: https://openlegislation.uk/crossrail-act-2008/schedule-1/paragraph-wrapper6n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

