  "heading": null,
  "text": "(1) The nominated undertaker may, in connection with the construction of the works authorised by this Act, stop up each of the highways or parts of highways specified in the following table.\n(2) No highway or part of a highway specified in columns (1) and (2) of Part 1 of the following table shall be stopped up under this paragraph unless all the land which abuts on it falls within one or more of the following categories, namely—\n(a) land to which there is no right of access directly from the highway or part to be stopped up,\n(b) land to which there is reasonably convenient access otherwise than directly from the highway or part to be stopped up,\n(c) land the owners and occupiers of which have agreed to the stopping up of the highway or part, and\n(d) land which is in the possession of the Secretary of State.\n(3) No highway or part of a highway specified in columns (1) and (2) of Part 2 of the following table shall be stopped up under this paragraph if a new highway is specified in relation to it in column (3) of that Part of the table, by reference to the letters and numbers shown on the deposited plans or by reference to scheduled works, until—\n(a) where the new highway is provided in exercise of the powers conferred by this Act, the later of the date of practical completion and the date on which it is first open for public use, and\n(b) where it is not, the date on which it is first open for public use.\n(4) Where a new highway specified in column (3) of Part 2 of the following table is provided in exercise of the powers conferred by this Act, the date of practical completion of the highway, or the date on which it is first open for public use, shall be taken for the purposes of sub-paragraph (3) to be what it is taken to be for the purposes of paragraph 11(2).\nPart 1\n(1)\n(2)\nArea\nHighway or part to be stopped up\nCity of Westminster\nFootpath within Westbourne Green Sports Complex between points P5, P6 and P7\nNorth-eastern side of Eastbourne Terrace within extent of narrowing shown on the deposited plans\nFalconberg Court\nLondon Borough of Camden\nAndrew Borde Street\nLondon Borough of Islington\nCowcross Street between points P1 and P2\nCity of London\nHayne Street between points P3 and P4\nFore Street Avenue between points P1 and P2\nMoorfields between points P2 and P3\nLondon Borough of Tower Hamlets\nFulbourne Street between points P1 and P2\nCourt Street between points P3 and P4\nWood's Buildings between points P5 and P6\nSouth-eastern side of Durward Street within the extent of narrowing shown on the deposited plans between points P2 and P7\nGarden Street between points P5 and P6\nEleanor Street between points P1 and P2\nLondon Borough of Greenwich\nBostall Manorway between points P3 and P4\nAbbey Terrace between points P5 and P6\nLondon Borough of Havering\nFootpath (FP 123) between Beechfield Gardens and Nursery Walk\nPart 2\n(1)\n(2)\n(3)\nArea\nHighway or part to be stopped up\nNew highway to be substituted for it\nCity of Westminster\nWestbourne Park Passage within the limits of deviation of Work No. 1/9C\nWork No. 1/9C\nWestbourne Park Passage within the limits of deviation of Work No. 1/9D\nWork No. 1/9D\nLondon Borough of Tower Hamlets\nFootpath between Stepney Way and Stepney Green between points P1, P2 and P3 and between points P2 and P4\nNew footpath between points P1, P4, P5 and P6\nLondon Borough of Newham\nFootpaths between the Excel Centre and Victoria Dock Road between points P1, P2, P3, P4, P5, P6, P7, P8 and P9 and between points P6 and P11\nNew footpath through intended station, part of Work No. 1/5 between points P10 and P11\nFootpath between Albert Road and Factory Road between points P1 and P2\nWork No. 1/32D\nBarbers Road between points P1 and P2\nWorks Nos. 2/6A, 2/6B and 2/7\nPudding Mill Lane between points P3 and P4\nWorks Nos. 2/6A, 2/6B and 2/7\nMarshgate Lane within the relevant limits\nWorks Nos. 2/6A and 2/6B\nFootpath (Greenway) between points P6, P7, P8, P9, P10, P11, P12 and P13 and between points P9 and P11\nNew footpath between points P5, P14 and P13\nLondon Borough of Greenwich\nFootpath on eastern side of Church Manor Way between points P1 and P2\nWork No. 1/34\nFootpath between Mottisfont Road and Bostall Manor Way between points P1 and P2\nWork No. 1/36\nLondon Boroughs of Greenwich and Bexley\nFootpaths over Abbey Wood Station between points P7, P8, P9, P10 and P11 and between points P11 and P12\nNew footpath through intended station, part of Work No. 1/7\nFelixstowe Road within the relevant limits\nWork No. 1/37B\nLondon Borough of Bexley\nGayton Road\nWork No. 1/37C\nLondon Borough of Barking & Dagenham\nFootpath on eastern side of Whalebone Lane South between points P1 and P3\nNew footpath between points P1, P2 and P3\nLondon Borough of Havering\nFootpath adjacent to bus stand, Atlanta Boulevard\nWork No. 2/15D\nCounty of Berkshire, Borough of Slough\nHollow Hill Lane between points P1 and P2\nWork No. 3/9D\nCounty of Buckinghamshire, District of South Bucks, Parish of Iver\nThorney Lane South between points P1 and P2\nWorks Nos. 3/9B and 3/9C\nLondon Borough of Hillingdon\nFootpath and cycleway (Kingston Lane) between points P1 and P2\nWork No. 3/10F\nOld Stockley Road between points P1 and P2\nFootpath and cycleway between points P1 and P2 (Work No. 3/14)",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "C",
      "label": "C1",
      "text": "Sch. 3 para. 1 applied (with modifications) (E.W.S.) (11.3.2014) by The Crossrail (Paddington Station Bakerloo Line Connection) Order 2014 (S.I. 2014/310), arts. 1, 18, Sch. 6 paras. 1-3"
    },
    {
      "type": "C",
      "label": "C2",
      "text": "Sch. 3 para. 1(2)(d) modified (21.4.2010) by The Crossrail (Devolution of Functions) Order 2010 (S.I. 2010/988), arts. 1, 8(2) (with art. 13)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukpga/2008/18/schedule/3/paragraph/1",
    "retrieved_at": "2026-10-29T09:11:51.049540+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",