Schedule 2 TABLE OF FEES PAYABLE

Original text. Later amendments are not shown.

Category of development for

which approval is sought:

Fee Payable

1. PLANS AND SPECIFICATIONS FOR THE FOLLOWING WORKS

A.

  1. (i)

    The erection, construction, alteration or extension of a building (including any transformer or telecommunications mast) excluding anything in C below

  2. (ii)

    The erection, construction, alteration or extension of any fences, walls or other barriers (including bunds) for visual or noise screening or dust suppression, or any other fences or walls

  3. (iii)

    The erection, construction or installation of lighting equipment

  1. (a)

    Where no gross floor space is to be created by the development, £170;

  2. (b)

    where the area of gross floor space to be created by the development does not exceed 40 square metres, £170;

  3. (c)

    where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £335;

  4. (d)

    where the area of gross floor space to be created by the development exceeds 75 square metres but does not exceed 3750 square metres £335 for each 75 square metres or part thereof of that area; and

  5. (e)

    where the area of gross floor space to be created by the development exceeds 3750 square metres, £16,565 and an additional £100 for each 75 square metres or part thereof subject to a maximum of £250,000.

B. Where no gross floor space is to be created by the development£170;
C. Construction, alteration or extension of any terracing, cuttings, embankments or other earth works.£170 for each 0.1 hectares or part thereof of the site, subject to a maximum of £1,700.
D. The erection, construction, alteration or extension of a pedestrian access to the railway line.£170
E. The disposal of waste or spoil or the excavations of bulk materials from borrow pits.£170 for each 0.1 hectare or part thereof of the site area, subject to a maximum of £25,500.
F. Additional Details Request£85
2. CONSTRUCTION ARRANGEMENTS
Road transport£170
Handling of re-usable spoil or top soil£170
Storage sites£170
Construction camps£170
Screening£170
Artificial lighting£170
Suppression of dust£170
Mud on highway£170
3. BRINGING INTO USE
Bringing into use works referred to in paragraph 9(3) or 17(3) of the Schedule.£170
4. MITIGATION OR SITE RESTORATION SCHEMES
Mitigation or site restoration schemes.£170