# The Crossrail (Plumstead Sidings) Order 2015, Schedule 1: SCHEDULED WORKS


Work No. 1 — A railway, comprising a reception siding and headshunt, commencing by a junction with the eastbound Crossrail railway line authorised by Work No. 1/7 in Schedule 1 to the principal Act at a point 15 metres north-west of the former level crossing of Churchmanor Way and the North Kent railway, passing westwards and terminating at a point 48 metres west of the bridge carrying the North Kent railway over White Hart Road.
Work No. 2 — A railway, comprising sidings to provide a stabling and maintenance depot, commencing by a junction with Work No. 1 at a point 222 metres east of the bridge carrying the North Kent railway over White Hart Road, passing north-eastwards and terminating at a point 305 metres north-west of the former level crossing of Churchmanor Way and the North Kent railway.
The work includes an accommodation building and a maintenance building within the depot site.

---
Source: https://www.legislation.gov.uk/uksi/2015/781/schedule/1 (the official version)
Page: https://openlegislation.uk/crossrail-plumstead-sidings-order-2015/schedule-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.