In this Schedule—
“alternative apparatus” means appropriate alternative apparatus to the satisfaction of National Grid to enable it to fulfil its statutory function in a manner no less efficient than previously;
“apparatus” means any mains, pipes or other apparatus belonging to or maintained by National Grid for the purpose of gas supply;
“commence” has the same meaning as in paragraph 1 of Schedule 2 (requirements);
“functions” includes powers and duties;
“in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over , across, along or upon such land;
“maintain” and “maintenance” include the ability and right to construct, use or renew any apparatus or alternative apparatus of the undertaker;
“National Grid” means National Grid Gas plc, company number 2006000, registered at 1-3 Strand, London WC2N 5EH; and
“plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed.

---
Source: https://www.legislation.gov.uk/uksi/2014/1796/schedule/6/paragraph/2 (the official version)
Page: https://openlegislation.uk/daventry-international-rail-freight-interchange-alteration-order-2014/schedule-6/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.