{
  "url": "https://openlegislation.uk/docklands-light-railway-capacity-enhancement-and-2012-games-preparation-order-2007/schedule-13/paragraph-1",
  "json_url": "https://openlegislation.uk/docklands-light-railway-capacity-enhancement-and-2012-games-preparation-order-2007/schedule-13/paragraph-1.json",
  "legislation": "uksi/2007/2297",
  "legislation_title": "The Docklands Light Railway (Capacity Enhancement and 2012 Games Preparation) Order 2007",
  "legislation_url": "https://openlegislation.uk/docklands-light-railway-capacity-enhancement-and-2012-games-preparation-order-2007",
  "path": "schedule/13/paragraph/1",
  "kind": "paragraph",
  "number": "1",
  "heading": null,
  "text": "(1) The following provisions of this Schedule shall, unless otherwise agreed in writing between DLRL and the Board, have effect.\n(2) In this Schedule—\n“construction”, in relation to any specified work or protective work, includes—\n(a) the execution and placing of that work; and\n(b) any replacing, relaying, removal, alteration, renewal, maintenance, repair or reconstruction of that work as may be carried out during the period of 12 months from the completion of that work;\nand “construct” and “constructed” shall be construed accordingly;\n“detriment” means any damage to the Dock or any other property of the Board and, without prejudice to the generality of that meaning, includes—\n(a) the erosion of the bed or banks of the Dock, or the impairment of the stability of any works, lands or premises forming part of the Dock;\n(b) the silting of the Dock or the deposit of materials in it so as to permanently damage the Dock;\n(c) the pollution of the Dock;\n(d) any permanent alteration in the water level of the Dock, or permanent interference with the supply of water thereto, or drainage of water therefrom; and\n(e) any permanent harm to the ecology of the Dock (including any permanent adverse impact on any site of special scientific interest comprised in the Dock);\n“the Dock” includes the waterside and any works, lands or premises belonging to the Board, or under its management or control, and held or used by the Board in connection with the Dock;\n“the engineer” means an engineer appointed by the Board for the purpose in question;\n“plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction) and programmes;\n“protective work” means a work which is reasonably necessary to be carried out before the commencement of construction of any specified work to prevent detriment;\n“specified work” means so much of any of the authorised works as is situated upon, across, under, over or within 15 metres of, or may directly and physically affect, the Dock; and\n“the waterside” means so much of the waterside as defined by section 2 of the 1994 Act, as is comprised within the foregoing definition of “the Dock”.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2007/2297/schedule/13/paragraph/1",
    "retrieved_at": "2026-10-29T03:45:43.857205+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}