Paragraph 6
Where so required by the engineer DLRL shall, to the reasonable satisfaction of the engineer, fence off any specified work or protective work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work or a protective work from the Dock, whether on a temporary or permanent basis or both.