# The Docklands Light Railway (Capacity Enhancement) Order 2005, Part 2: STREETS FOR WHICH NO SUBSTITUTE WILL BE PROVIDED

Extent: E+W+S

(1)
(2)
(3)
Area
Street to be stopped up
Extent of stopping up
In the London borough of Tower Hamlets
Branch Road
Footways to be narrowed between points N1 and N2 and between points N3 and N4.
Westferry Road
Footway to be stopped up between points F1 and F2 and between points F4 and F5.
Westferry Road
Central reservation between points N8 and N9.
Westferry Road
Footway to be narrowed between points N5, N6 and N7.
Aspen Way
Footway to be stopped up between points P1, P2, P3 and P4.

---