# The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004, Paragraph 2


In this Schedule—
“construction” includes execution, placing, altering, replacing, relaying and, in relation to temporary works, removal; and “construct” and “constructed” shall be construed accordingly;
“damage” includes scouring, erosion and environmental damage and “damaged” shall be construed accordingly;
“drainage work” means any watercourse and includes any land used for providing flood storage capacity for any watercourse, and land shown on indicative floodplain maps published by the Agency from time to time as being available to provide flood storage capacity for any watercourse, and any bank, wall, embankment or other structure or appliance constructed or used for land drainage, flood defence or tidal monitoring;
“the fishery” means any waters containing fish and fish in, or migrating to or from, such waters and the spawn, habitat or food of such fish;
“plans” includes sections, drawings, specifications and method statements;
“specified work” means so much of any work or operation authorised by this Order (other than works required in an emergency) as is in, on, under, over or within 16 metres of a drainage work or is otherwise likely to—
(a)affect any drainage work or the volumetric flow of water in or flowing to or from any drainage work;
(b)affect the flow, purity or quality of water in any watercourse or other surface waters or ground water;
(c)cause obstruction to the free passage of fish or damage to any fishery; or
(d)affect the conservation, distribution or use of water resources;
“the Thames inlet” means the inlet of the River Thames within the land numbered 92 and 107 on the deposited plans; and
“watercourse” includes all rivers, streams, ditches, drains, cuts, culverts, dykes, sluices, sewers (other than public sewers within the meaning of the Water Industry Act 1991) and passages through which water flows (whether or not the flow is intermittent).

---
Source: https://www.legislation.gov.uk/uksi/2004/757/schedule/15/paragraph/2 (the official version)
Page: https://openlegislation.uk/docklands-light-railway-woolwich-arsenal-extension-order-2004/schedule-15/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

