Article 2 Corrections
The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 is corrected as set out in the table in the Schedule, where—
(a)
column 1 sets out where the correction is to be made;
(b)
column 2 sets out text to be omitted; and
(c)
column 3 sets out text to be substituted in place of the omitted text.