# The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015, Paragraph 19: Surface and foul water drainage

Extent: E+W+S

(1) The Project A converter station works must not commence until a detailed scheme addressing the matters referred to in sub-paragraph (2) has been submitted to and approved in writing by the relevant planning authority following consultation with the Environment Agency.
(1A) The Project B converter station works must not commence until a detailed scheme addressing the matters referred to in sub-paragraph (2) has been submitted to and approved in writing by the relevant planning authority following consultation with the Environment Agency.
(2) Each scheme must take account of the mitigation measures in relation to operational activities at the converter station site, as detailed within section 7 of Chapter 24 of the environmental statement, and must include—
(a) details of any proposed underground oil separators, including the full structural details of the installation and the mitigation to be embedded into the design of the installation in order to protect ground and surface waters;
(b) details of the proposed storage bund installations, including full structural details of the installation and the mitigation to be embedded into the design of the installation in order to protect ground and surface waters; and
(c) an emergency plan, including provisions to ensure that controlled waters are protected in an emergency event.
(3) Each scheme must be implemented as approved in writing by the relevant planning authority.

---
Source: https://www.legislation.gov.uk/uksi/2015/318/schedule/1/paragraph/19 (the official version)
Page: https://openlegislation.uk/dogger-bank-creyke-beck-offshore-wind-farm-order-2015/schedule-1/paragraph-19
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.