# The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015, Schedule 5: Land over which only new rights may be acquired

Extent: E+W+S

(1)
(2)
Plot reference number shown on land plan
Purpose for which rights over land may be acquired
1Bi, 1Bii, 4Bi, 4Bii, 4Biii, 16B, 19B, 21B, 23B, 29B, 32B, 34B, 36B, 41B, 49B, 56B, 58B, 60B, 62B, 64B, 66B, 72B, 74B, 76B, 83B, 84B, 85B, 90B, 88B, 98B, 99Bi, 99Bii, 100B, 101B, 102B, 103B, 104B, 109B, 117B, 120B, 121B
New right for the installation, inspection, maintenance, renewal, repair, replacement and use of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 4
152
New right for the installation, inspection, maintenance, renewal, repair, replacement and use of up to 3 export cables for the transmission of HVAC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 4
153, 154, 155, 156, 157B, 159, 161, 162
New right for the construction of a new connection bay within the National Grid substation containing isolation switchgear and electrical equipment for the connection of the export cable to the transmission network for the benefit of Bizco 4
1Ai, 1Aii, 2i, 4Ai, 16A, 19A, 21A, 23A, 29A, 32A, 34A, 36A, 41A, 49A, 56A, 58A, 60A, 62A, 64A, 66A, 72A, 74A, 76A, 83A, 84A, 85A, 88A, 90C, 98A, 99Ai, 99Aii, 100A, 101A, 102A, 103A, 104A, 109A, 117A, 120A, 121A
New right for the installation, inspection, maintenance, renewal, repair, replacement and use of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 1
151, 157C
New right for the installation, inspection, maintenance, renewal, repair, replacement and use of up to 3 export cables for the transmission of HVAC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 1
157A, 157E, 165i, 166, 167, 168, 169, 170
New right for the construction of a new connection bay within the National Grid substation containing isolation switchgear and electrical equipment for the connection of the export cable to the transmission network for the benefit of Bizco 1
13E, 14, 15, 39E, 40, 81E, 82, 86, 87E, 87F, 87G, 87H, 87I, 107E, 107F, 108, 112E, 113
New right for the installation, inspection, maintenance, renewal, repair and replacement of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 1 and Bizco 4
137i, 137ii, 139, 140, 141, 142, 143, 144, 145
New right for—
1) the inspection, maintenance, renewal, repair and replacement of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cables for the transmission of electronic communications;
2) the inspection, maintenance, renewal, repair and replacement of up to 3 export cables for the transmission of HVAC electricity, together with fibre-optic cables for the transmission of electronic communications; and
3) the inspection, maintenance, renewal, repair and replacement of the converter stations
in each case for the benefit of Bizco 1 and Bizco 4
130
New right for the installation, inspection, maintenance, renewal, repair, replacement and use of 2 export cables for the transmission of HVAC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 1 and Bizco 4
133, 134, 135, 137ii
New right for the installation, inspection, maintenance, renewal, repair and replacement of up to 3 export cables for the transmission of HVAC electricity, together with fibre-optic cables for the transmission of electronic communications for the benefit of Bizco 1 and Bizco 4
158, 160, 164, 165ii, 165iii, 172, 173, 174, 175
New right for the inspection, maintenance, renewal, repair and replacement of the new connection bay within the National Grid substation for the benefit of Bizco 1 and Bizco 4
138
New right for landscaping together with the inspection, maintenance, renewal, repair and replacement of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cable for the transmission of electronic communications for the benefit of Bizco 1 and Bizco 4
112C
New right for the installation, inspection, maintenance, renewal, repair and replacement of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cable for the transmission of electronic communications for the benefit of Bizco 1
157B
New right for the construction of a new connection bay within the National Grid substation containing isolation switchgear and electrical equipment for the connection of the export cable to the transmission network for the benefit of Bizco 1
13C, 39C, 81C, 87C, 90A, 107C
New right for the installation, inspection, maintenance, renewal, repair and replacement of 2 export cables for the transmission of HVDC electricity, together with fibre-optic cable for the transmission of electronic communications for the benefit of Bizco 4

---
Source: https://www.legislation.gov.uk/uksi/2015/318/schedule/5 (the official version)