# The Dogger Bank South East and West Offshore Wind Farms Order 2026, Part 2: Conditions


Offshore converter platform dimensions
10 (1) The total number of offshore converter platforms in respect of the authorised scheme must not exceed one.
(2) The dimensions of any offshore converter platform (excluding helidecks, lightning protection, towers, masts and cranes) must not exceed—
(a) 125 metres in length;
(b) 100 metres in width; or
(c) 105 metres in height above LAT.
Offshore converter platform foundations
11 (1) Offshore converter platform foundations must be of one or more of the following foundation options: piled monopile, or piled jacket foundation.
(2) The pile diameter of any offshore converter platform piled monopile foundation must not exceed 15 metres.
(3) Any offshore converter platform piled jacket must not have—
(a) more than eight legs;
(b) more than eight piles; or
(c) a pile diameter exceeding 3.8 metres.
(4) Any offshore converter platform foundation must not have—
(a) a seabed footprint (including scour protection) exceeding 5,411 square metres; or
(b) a seabed footprint (excluding scour protection) exceeding 3,317 square metres.
(5) Within Work No. 2B, the offshore converter platforms foundations must not have—
(a) a total combined seabed footprint (including scour protection) exceeding 5,411 square metres; or
(b) a total combined amount of scour protection exceeding 5,234 square metres.
(6) The total volume of scour protection for offshore converter platforms in respect of the authorised scheme must not exceed 9,450 cubic metres.
Cables and cable protection
12 (1) Within Work No. 3B the offshore export cables must not, in total—
(a) exceed 2 in number;
(b) exceed 306 kilometres in length;
(c) exceed 12 cable crossings;
(d) have cable protection (including cable crossings) exceeding 470,350 square metres in area; or
(e) have cable protection (including cable crossings) exceeding 426,747 cubic metres in volume.
(2) The offshore export cables within Work No. 3B which fall within the Dogger Bank Special Area of Conservation must not have cable protection exceeding 10% of the length of such cables, when combined with the offshore export cables, array cables and inter-platform cables authorised by the licences granted under Schedules 10 to 12 and 14 to 14A of the Order.
(3) Within the area between MHWS and 350 metres seaward of MLWS, all offshore export cables must be buried, and must not have cable protection.
(4) Any offshore export cables within the area between 350 metres seaward of MLWS and the 10 metre depth contour as measured against LAT (as at the date of commencement of construction of the licensed activities) must not have cable protection exceeding 10% of the length of such cables, when combined with the offshore export cables authorised by the licence granted under Schedule 12 of the Order.
(5) Within Work No. 2B the inter-platform cables must not, in total—
(a) exceed 1 in number;
(b) exceed 23 kilometres in length;
(c) exceed 1 cable crossings;
(d) have cable protection (including cable crossings) exceeding 43,203 square metres in area; or
(e) have cable protection (including cable crossings) exceeding 39,207 cubic metres in volume.

---
Source: https://www.legislation.gov.uk/uksi/2026/577/schedule/13/part/2 (the official version)
Page: https://openlegislation.uk/dogger-bank-south-east-and-west-offshore-wind-farms-order-2026/schedule-13/part-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

