  "url": "https://openlegislation.uk/dogger-bank-south-east-and-west-offshore-wind-farms-order-2026/schedule-14/paragraph-3",
  "json_url": "https://openlegislation.uk/dogger-bank-south-east-and-west-offshore-wind-farms-order-2026/schedule-14/paragraph-3.json",
  "legislation": "uksi/2026/577",
  "legislation_title": "The Dogger Bank South East and West Offshore Wind Farms Order 2026",
  "legislation_url": "https://openlegislation.uk/dogger-bank-south-east-and-west-offshore-wind-farms-order-2026",
  "path": "schedule/14/paragraph/3",
  "kind": "paragraph",
  "number": "3",
  "heading": "Details of licensed marine activities",
  "text": "Such activities are authorised in relation to the construction, maintenance and operation of—\nWork No. 5A—\nUp to three HVAC subsea export cables linking Work Nos. 2A and 2B providing an electrical connection between Work Nos. 1A and 1B, including cable crossings and cable protection;\nWork No. 7A—\nA temporary work area associated with Work Nos. 1A to 5A for vessels to carry out intrusive activities and non-intrusive activities alongside Work Nos. 1A to 5A;\nIn connection with such Work Nos. 5A and 7A and to the extent that they do not otherwise form part of any such work, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised scheme and which fall within the scope of the work assessed by the environmental statement and the provisions of this licence, including—\n(a) scour protection around the foundations of the offshore structures;\n(b) cable protection measures such as the placement of rock and/or concrete mattresses, with or without frond devices;\n(c) the removal of material from the seabed required for the construction of Work Nos. 5A and 7A and the disposal of inert material of natural origin within the Order limits produced during construction drilling, seabed preparation for foundation works, cable installation preparation such as sandwave clearance, and boulder clearance;\n(d) removal of static fishing equipment;\n(e) temporary landing places, moorings or other means of accommodating vessels in the construction or maintenance of the authorised scheme;\n(f) creation and use of temporary laydown areas, use of cable lay vessel anchors; and\n(g) lighting.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2026/577/schedule/14/paragraph/3",
    "retrieved_at": "2026-10-28T21:00:40.235929+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}