  "url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-amendment-no-2-order-2020/article-15",
  "json_url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-amendment-no-2-order-2020/article-15.json",
  "legislation": "uksi/2020/1389",
  "legislation_title": "The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020",
  "legislation_url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-amendment-no-2-order-2020",
  "path": "article/15",
  "kind": "article",
  "number": "15",
  "heading": "Amendments to Part 3 (requirements) of Schedule 1 (authorised project)",
  "text": "Paragraph 20 of Part 3 of Schedule 1 is amended as follows—\n(a) in paragraph 20(1)—\n(i) after “Except where”, insert “a stage of”;\n(ii) after “the onshore works” insert “(or part thereof) is”;\n(iii) for “their layout” substitute “the layout”;\n(iv) after “(in so far as not shown on those plans)” insert “for the relevant stage”; and\n(v) for “This must include a section showing cable depths for Work Nos. 4A, 5A, 4B and 5B” substitute “Where the relevant stage includes all or any part of Work Nos. 4A, 5A, 4B or 5B, this must include a section showing cable depths for Work Nos. 4A, 5A, 4B or 5B as appropriate”.\n(b) after paragraph 20(2) insert the following—\n“(3) For the avoidance of doubt (and to the extent that such works are not carried out in accordance with the plans referred to in Requirement 19 and therefore require approval)—\n(a) in relation to Work No. 7, the relevant planning authority may approve—\n(i) the detailed design for the Project A converter station works and the Project B converter station works as separate stages (or part thereof); and\n(ii) the detailed design for the Project A converter station enabling works and the Project B converter station enabling works as either separate stages (or part thereof) or as a single stage (or part thereof) comprising the Work No.7 enabling works;\n(b) in relation to Work No. 8S, the relevant planning authority may approve the detailed design for the Project A HVAC cable works and the Project B HVAC cable works as either separate stages (or part thereof) or the same stage (or part thereof);\n(c) in relation to Work No. 9, the relevant planning authority may approve the detailed design for the Project A National Grid substation connection works and the Project B National Grid substation connection works as either separate stages (or part thereof) or the same stage (or part thereof);\n(d) in relation to Work Nos. 2A, 2B, 3A, 3B, 4A, 4B, 5A, 5B, 6A, 6B, 8A, 8B and 8S the relevant planning authority may approve the detailed design of the cable preparation works as a separate stage (or part thereof); and\n(4) The details approved under paragraph (1) may cover one or more stages of the onshore works.”",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2020/1389/article/15",
    "retrieved_at": "2026-10-28T22:21:51.595325+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}