Article 3 Amendments to Article 2 (interpretation)
Article 2 is amended as follows—
in the definition of “cable”—
after “in a cable duct” delete “and”; and
after “a fibre optic cable” insert “and, in respect of a HVAC onshore cable only, cables laid in a trefoil”;
in the definition of “Marine Licence 1” after “(Marine Licence 1: Project A Offshore Generation – Work Nos. 1A and 2T)” insert “(as amended by any variations to the licence made by the MMO)”;
in the definition of “Marine Licence 2” after “(Marine Licence 2: Project B Offshore Generation – Work Nos. 1B and 2T)” insert “(as amended by any variations to the licence made by the MMO)”;
in the definition of “Marine Licence 3” after “(Marine Licence 3: Project A Offshore Generation – Work Nos. 2A, 3A and 2T)” insert “(as amended by any variations to the licence made by the MMO)”;
in the definition of “Marine Licence 4” after “(Marine Licence 4: Project B Offshore Generation – Work Nos. 2B, 3B and 2T)”insert “(as amended by any variations to the licence made by the MMO)”;
in the definition of “Project A offshore works” after “means” insert “(except in Part 3 of Schedule 1)”;
in the definition of “Project A onshore works” after “means” insert “(except in Part 3 of Schedule 1)”;
in the definition of “Project B offshore works” after “means” insert “(except in Part 3 of Schedule 1)”;
In the definition of “Project B onshore works” after “means” insert “(except in Part 3 of Schedule 1)”;
In the definition of “relevant planning authority for the Port” after “to service the construction” insert “of all or part”;
In the definition of “shared works” after “means” insert “(except in Part 3 of Schedule 1)”;
In sub-paragraph (3)(b) after “Conditions 3 to 11” insert “(Detailed offshore design parameters)”; and
In sub-paragraph (3)(c) after “Conditions 3 to 9” insert “(Detailed offshore design parameters)”.