# The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020, Article 8: Amendments to Part 3 (requirements) of Schedule 1 (authorised project)


Paragraph 1 of Part 3 (requirements) of Schedule 1 (authorised project) is amended as follows—
(a) after “In this Part—”, insert ““cable preparation works” means all or any part of the trenched or trenchless installation works to install cable ducting or otherwise facilitate the laying of cables in the relevant sections of Work Nos. 3A, 3B, 4A, 4B, 5A, 5B, 6A, 6B, 8A, 8B, and 8S and including temporary construction compounds;”;
(b) for the definition of “onshore works”, substitute ““onshore works” means the Project A onshore works, the Project B onshore works and the shared works (all as defined in Part 3 of this Schedule);”;
(c) after the definition of “onshore works” insert—
““Project A converter station works” means the electrical converter substation and export cables included in Work No. 7 relating to Project A only (and which for the avoidance of doubt exclude the Work No.7 enabling works);
“Project B converter station works” means the electrical converter substation and export cables included in Work No. 7 relating to Project B only (and which for the avoidance of doubt exclude the Work No. 7 enabling works);
“Project A converter station enabling works” means the enabling works included in Work No. 7 which are required for the Project A converter station only, including site clearance, landscaping, haul roads, temporary construction compounds, cable ducting and may include the laying of drainage and other services and the construction of a foundational platform;
“Project B converter station enabling works” means the enabling works included in Work No. 7 which are required for the Project B converter station only, including site clearance, landscaping, haul roads, temporary construction compounds, cable ducting and may include the laying of drainage and other services and the construction of a foundational platform;
“Project A HVAC cable works” means the works included in Work No. 8S which are required for Project A only comprising up to 3 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary, from the electrical converter substation comprised in Work No. 7 and running in a westerly direction for a distance of 575 metres to Work No. 8A, including the construction of a haul road and construction access;
“Project B HVAC cable works” means the works included in Work No. 8S which are required for Project A only comprising up to 3 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary, from the electrical converter substation comprised in Work No. 7 and running in a westerly direction for a distance of 575 metres to Work No. 8B, including the construction of a haul road and construction access;
“Project A National Grid substation connection works” means the works included in Work No 9 which are required for Project A only connecting Work No 8A to the transmission network and comprising up to 3 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications, including connection bays within the National Grid substation located above ground incorporating isolation switchgear, circuit bay equipment, overhead tubular connectors and switching and measuring equipment located above and below ground;
“Project B National Grid substation connection works” means the works included in Work No 9 which are required for Project B only connecting Work No 8B to the transmission network and comprising up to 3 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications, including connection bays within the National Grid substation located above ground incorporating isolation switchgear, circuit bay equipment, overhead tubular connectors and switching and measuring equipment located above and below ground;
“Project A offshore works” means Work Nos. 1A, 2A and 2T and any related associated development;
“Project B offshore works” means Work Nos. 1B, 2B and 2T and any related associated development;
“Project A onshore works” means the Project A converter station works, Project A converter station enabling works (where the Project A converter station enabling works are not undertaken as shared works), the Project A HVAC cable works (where the Project A HVAC cable works are not undertaken as a shared work), the Project A National Grid substation connection works (where the Project A National Grid substation connection works are not undertaken as a shared work), Work Nos. 3A, 4A, 5A, 6A and 8A and any related associated development save that cable preparation works relating to Work Nos. 3A, 4A, 5A, 6A and 8A are excluded where those works are carried out as shared works;
“Project B onshore works” means the Project B converter station works, Project B converter station enabling works (where the Project B converter station enabling works are not undertaken as shared works), the Project B HVAC cable works (where the Project B HVAC cable works are not undertaken as a shared work), the Project B National Grid substation connection works (where the Project B National Grid substation connection works are not undertaken as a shared work),Work Nos. 3B, 4B, 5B, 6B and 8B and any related associated development save that cable preparation works relating to Work Nos. 3B, 4B, 5B, 6B and 8B are excluded where those works are carried out as shared works;
“rail crossing works” - means the Project A and Project B cables within Work Nos. 6A and 6B on sheet 2 of the onshore works plans situated within the area enclosed by the points whose co-ordinates are set out in Table 1 below:
Table 1
Easting (m) BNG
Northing (m) BNG
462406.515
522780.193
462427.144
522750.727
462218.294
522605.064
462067.818
522479.539
462054.713
522465.264
462057.708
522437.332
462021.914
522433.486
462017.305
522476.474
462018.425
522484.885
462040.484
522508.912
462132.070
522585.583
462218.853
522649.338
“shared works” means Work Nos. 7L, 10A, 10B, 10C, 10D, 10E, 10F, 10G, 10H, 10I, 10J, 10K and any related associated development and may include 8S, 9, the Work No 7 enabling works and the cable preparation works;”
(d) in the definition of “stages”—
(i) after “the following stages of the onshore works” insert “(all or any part of”;
(ii) after “in sequential order or” insert “in parallel) or as”;
(iii) after “otherwise” insert “agreed with the relevant planning authority”;
(iv) after “Stage 1” insert “(Project A)”;
(v) after “Stage 2” insert “(Project B)”;
(e) after “Stage 3” for “Work Nos. 6A, 8A, 10A, 10B, 10C, 10D, 10E, 10F, 10G, 10H, 10I and 10K” substitute “(Project A) – Work Nos. 6A and 8A”;
(f) after “Stage 4” for “Work Nos. 6B, 8B, 10A, 10B, 10C, 10D, 10E, 10F, 10G, 10H, 10I and 10K” substitute “(Project B) – Work Nos. 6B and 8B”;
(g) after “Stage 5” for “Work Nos. 7, 7L, 10H and 10I” substitute “(shared works) – cable preparation works (where the cable preparation works are undertaken as a shared work)”;
(h) for —
“Stage 6 - Work Nos. 8S, 8A, 10H, 10I, 10J and 10K;
Stage 7 - Work Nos. 8S, 8B, 10H, 10I, 10J and 10K;
Stage 8 - Work Nos. 9, 10H, 10I, 10J and 10K.”
substitute—
“Stage 6 (shared works) –Work Nos. 10A, 10B, 10C, 10D, 10E, 10F, 10G, 10H, 10I, 10J and 10K;
Stage 7 (shared works) – Work No 7 enabling works (where the Project A converter station enabling works and the Project B converter station enabling works are undertaken as a shared work), Work No. 8S (where Work No. 8S is undertaken as a shared work), Work Nos. 7L, and 10I;
Stage 8 (Project A) - Project A converter station enabling works (where the Project A converter station enabling works are not undertaken as a shared work);
Stage 9 (Project A) – Project A converter station works;
Stage 10 (Project B) - Project B converter station enabling works (where the Project B converter station enabling works are not undertaken as a shared work);
Stage 11 (Project B) – Project B converter station works;
Stage 12 (Project A) – Project A HVAC cable works (where the Project A HVAC cable works are not undertaken as a shared work) and Work No. 8A;
Stage 13 (Project B) – Project B HVAC cable works (where the Project B HVAC cable works are not undertaken as a shared work) and Work No. 8B;
Stage 14 (shared works) - Work Nos. 9 (where Work No. 9 is undertaken as a shared work), 10J and 10K;
Stage 15 (Project A) – Project A National Grid substation connection works (where the Project A National Grid substation connection works are not undertaken as a shared work);
Stage 16 (Project B) – Project B National Grid substation connection works (where the Project B National Grid substation connection works are not undertaken as a shared work);”
(i) After the definition of “stages” insert—
“Wilton cable works” means the Project A and Project B cables within Work Nos. 6A and 6B on sheet 2 of the onshore works plans situated within the two areas enclosed by the points whose co-ordinates are set out in Tables 2 and 3 below:
Table 2
Easting (m) BNG
Northing (m) BNG
457995.815
520732.985
458071.142
520767.408
458081.887
520788.485
458085.370
520791.801
458130.023
520811.134
458135.809
520811.596
458156.227
520806.411
458200.681
520826.654
458208.099
520810.253
458160.807
520788.718
458157.445
520787.916
458152.518
520788.781
458087.065
520759.011
458084.595
520754.696
458081.480
520752.342
458003.471
520716.693
Table 3
Easting (m) BNG
Northing (m) BNG
457745.560
520603.565
457755.779
520621.038
457757.502
520623.162
457759.758
520624.658
457772.701
520630.665
457776.465
520632.863
457833.319
520658.799
457840.896
520642.471
457784.370
520616.683
457781.508
520614.957
457774.705
520611.751
457762.725
520597.263
457761.000
520599.000
457758.900
520600.800
457756.500
520602.300
457753.900
520603.300
457750.800
520603.900
457748.100
520603.850
“Work No 7 enabling works” means both the Project A converter station enabling works and the Project B converter station enabling works.”.

---
Source: https://www.legislation.gov.uk/uksi/2020/1389/article/8 (the official version)
Page: https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-amendment-no-2-order-2020/article-8
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.