{
  "url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-amendment-order-2021/article-5",
  "json_url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-amendment-order-2021/article-5.json",
  "legislation": "uksi/2021/39",
  "legislation_title": "The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021",
  "legislation_url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-amendment-order-2021",
  "path": "article/5",
  "kind": "article",
  "number": "5",
  "heading": "Amendments to Part 3 (Requirements) of Schedule 1 (Authorised Project)",
  "text": "Part 3 (Requirements) of Schedule 1 (Authorised Project) is amended as follows—\n(a) in paragraph 5(8B)(b) for “3,000 kilojoules” substitute “4,000 kilojoules”.\n(b) in Paragraph 6(1) for “Wind” substitute “Within Work No. 1A, wind”.\n(c) after paragraph 6 insert—\n“6A. (1) Within Work No. 1(B), wind turbine generator foundation structures must be of 1 or more of the following foundation options: monopole, multi-leg or gravity base.\n(2) No wind turbine generator foundation structure employing a footing of driven piles may—\n(a) have more than 6 driven piles;\n(b) in the case of single-pile structures, have a pile diameter exceeding 12 metres or employ a hammer energy during installation exceeding 4,000 kilojoules;\n(c) in the case of structures with 2 or more piles, have a pile diameter exceeding 3.5 metres or employ a hammer energy during installation exceeding 2,300 kilojoules.\n(3) No wind turbine generator foundation may have—\n(a) a main supporting structure exceeding 61 metres in width;\n(b) a seabed footprint (excluding subsea scour protection) exceeding 2,376 square metres;\n(c) a seabed footprint (including subsea scour protection) exceeding 5,675 square metres.\n(4) The foundations for wind turbine generators must be in accordance with the wave reflection co-efficient values set out in Table 3.6 in Chapter 5, Appendix B (foundation characterisation study) of the environmental statement.”;\n(d) in paragraph 9(3)(b) for “1 fibre-optic cable’ substitute “2 fibre-optic cables”.\n(e) in paragraph 13(6)(b) after “(see Condition 16(a)” insert “Pre-construction plans and documentation: Array location and layout plan”.\n(f) in paragraph 14 after “Condition 22 (Aids to Navigation) of Marine Licence 3 or” delete “4” and insert “Condition 23 (Aids to Navigation) of Marine Licence 4 ”.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2021/39/article/5",
    "retrieved_at": "2026-10-28T22:18:26.496499+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}