(1) Within Work No. 1A, the HVAC cable crossings must not, in total, exceed—
(a) 24 in number;
(b) 132,700 cubic metres in volume of cable crossing material;
(c) 147,100 square metres in seabed footprint.
(2) Within Work No. 1B the HVAC cable crossings must not, in total, exceed—
(a) 24 in number;
(b) 132,700 cubic metres in volume of cable crossing material;
(c) 147,100 square metres in seabed footprint.

---