{
  "url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015/schedule-1/paragraph-6",
  "json_url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015/schedule-1/paragraph-6.json",
  "legislation": "uksi/2015/1592",
  "legislation_title": "The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015",
  "legislation_url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015",
  "path": "schedule/1/paragraph/6",
  "kind": "paragraph",
  "number": "6",
  "heading": null,
  "text": "(1) Within Work No. 1A, wind turbine generator foundation structures must be of 1 or more of the following foundation options: monopole, multi-leg or gravity base.\n(2) No wind turbine generator foundation structure employing a footing of driven piles may—\n(a) have more than 6 driven piles;\n(b) in the case of single-pile structures, have a pile diameter exceeding 12 metres or employ a hammer energy during installation exceeding 4,000 kilojoules;\n(c) in the case of structures with 2 or more piles, have a pile diameter exceeding 3.5 metres or employ a hammer energy during installation exceeding 2,300 kilojoules.\n(3) No wind turbine generator foundation may have—\n(a) a main supporting structure exceeding 61 metres in width;\n(b) a seabed footprint (excluding subsea scour protection) exceeding 2,376 square metres;\n(c) a seabed footprint (including subsea scour protection) exceeding 5,675 square metres.\n(4) The foundations for wind turbine generators must be in accordance with the wave reflection co-efficient values set out in Table 3.6 in Chapter 5, Appendix B (foundation characterisation study) of the environmental statement.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 Pt. 3 para. 6(1) substituted (15.1.2021) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021 (S.I. 2021/39), arts. 1, 5(b)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Word in Sch. 1 Pt. 3 para. 6(2)(b) substituted (25.1.2021) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2021 (S.I. 2021/71), arts. 1, 4"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 Pt. 3 para. 6 in force at 26.8.2015, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2015/1592/schedule/1/paragraph/6",
    "retrieved_at": "2026-10-28T23:33:07.566234+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}