  "url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015/schedule-1/part-1/paragraph-1",
  "json_url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015/schedule-1/part-1/paragraph-1.json",
  "legislation": "uksi/2015/1592",
  "legislation_title": "The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015",
  "legislation_url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015",
  "path": "schedule/1/part/1/paragraph/1",
  "kind": "paragraph",
  "number": "1",
  "heading": null,
  "text": "A nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act located in the Dogger Bank Zone comprising—\nProject A offshore works\nWork No. 1A–\n(a)an offshore wind turbine generating station with a gross electrical output capacity of more than 100 megawatts comprising up to 200 wind turbine generators each fixed to the seabed by monopole, multi-leg or gravity base type foundations situated within the area enclosed by the points whose co-ordinates are set out in Table 1A (the “array area”);\nTable 1A - Array area\nPoint\nLatitude\n(decimal degrees)\nLongitude\n(decimal degrees)\n31\n55.11790\n2.57524\n32\n55.11860\n3.09890\n33\n55.10690\n3.09409\n34\n55.09071\n3.08744\n35\n55.07452\n3.08080\n36\n55.05832\n3.07416\n37\n55.04213\n3.06752\n38\n55.02594\n3.06090\n39\n55.00974\n3.05427\n40\n54.99487\n3.04820\n41\n54.97803\n3.04132\n42\n54.97735\n3.04104\n43\n54.96115\n3.03444\n44\n54.95485\n3.03187\n45\n54.95510\n3.01393\n46\n54.95556\n2.97851\n47\n54.95562\n2.97450\n50\n54.96011\n2.57690\n(b)up to 7 offshore platforms comprising the following—\n(i)up to 4 offshore collector platforms situated within the array area and fixed to the seabed by multi-leg or gravity base type foundations;\n(ii)1 offshore converter platform situated within the array area and fixed to the seabed by multi-leg or gravity base type foundations;\n(iii)up to 2 offshore accommodation or helicopter platforms situated within the array area and fixed to the seabed by multi-leg or gravity base type foundations,\nprovided that any of the platforms comprised in Work No. 1A(b)(i) to (iii) may be co-joined to create a combined platform fixed to the seabed by multi-leg or gravity base type foundations;\n(c)up to 5 meteorological stations situated within the array area either fixed to the seabed by monopole, multi-leg or gravity base type foundations or utilising a floating support structure anchored to the seabed;\n(d)a network of cables for the transmission of electricity and electronic communications laid on or beneath the seabed (including cable crossings) between—\n(i)any of the wind turbine generators comprised in Work No. 1A(a);\n(ii)any of the wind turbine generators comprised in Work No. 1A(a) and any of the works comprised in Work No. 1A(b) or Work No. 1A(c);\n(iii)any of the works comprised in Work No. 1A(b) and any of the works comprised in Work No. 1A(c); ...\n(iv)the offshore converter platform referred to in Work No. 1A(b)(ii) or a combined platform referred to in Work No. 1A(b) and the export cable route in Work No. 2A; and\n(v) any of the offshore platforms comprised in Work No. 1A(b); and\n(e)up to 10 vessel moorings situated within the array area consisting of a single floating buoy secured by chain and anchor anchored to the seabed.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 Pt. 1 para. 1 substituted (12.8.2020) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2020 (S.I. 2020/851), arts. 1, 3(2)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in Sch. 1 Pt. 1 para. 1 inserted (25.1.2021) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2021 (S.I. 2021/71), arts. 1, 3(a)"
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Word in Sch. 1 Pt. 1 para. 1 omitted (25.1.2021) by virtue of The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2021 (S.I. 2021/71), arts. 1, 3(b)"
    },
    {
      "type": "F",
      "label": "F4",
      "text": "Words in Sch. 1 Pt. 1 para. 1 inserted (25.1.2021) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2021 (S.I. 2021/71), arts. 1, 3(c)"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 Pt. 1 para. 1 in force at 26.8.2015, see art. 1"
    },
    {
      "type": "footnote",
      "label": "f1",
      "text": "Section 14 was amended by article 2(2) of S.I. 2012/1645."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2015/1592/schedule/1/part/1/paragraph/1",
    "retrieved_at": "2026-10-28T23:33:07.566234+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}