# The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015, Paragraph 1

Extent: E+W+S

A nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act located in the Dogger Bank Zone comprising—
Project A offshore works
Work No. 1A–
(a)an offshore wind turbine generating station with a gross electrical output capacity of more than 100 megawatts comprising up to 200 wind turbine generators each fixed to the seabed by monopole, multi-leg or gravity base type foundations situated within the area enclosed by the points whose co-ordinates are set out in Table 1A (the “array area”);
Table 1A - Array area
Point
Latitude
(decimal degrees)
Longitude
(decimal degrees)
31
55.11790
2.57524
32
55.11860
3.09890
33
55.10690
3.09409
34
55.09071
3.08744
35
55.07452
3.08080
36
55.05832
3.07416
37
55.04213
3.06752
38
55.02594
3.06090
39
55.00974
3.05427
40
54.99487
3.04820
41
54.97803
3.04132
42
54.97735
3.04104
43
54.96115
3.03444
44
54.95485
3.03187
45
54.95510
3.01393
46
54.95556
2.97851
47
54.95562
2.97450
50
54.96011
2.57690
(b)up to 7 offshore platforms comprising the following—
(i)up to 4 offshore collector platforms situated within the array area and fixed to the seabed by multi-leg or gravity base type foundations;
(ii)1 offshore converter platform situated within the array area and fixed to the seabed by multi-leg or gravity base type foundations;
(iii)up to 2 offshore accommodation or helicopter platforms situated within the array area and fixed to the seabed by multi-leg or gravity base type foundations,
provided that any of the platforms comprised in Work No. 1A(b)(i) to (iii) may be co-joined to create a combined platform fixed to the seabed by multi-leg or gravity base type foundations;
(c)up to 5 meteorological stations situated within the array area either fixed to the seabed by monopole, multi-leg or gravity base type foundations or utilising a floating support structure anchored to the seabed;
(d)a network of cables for the transmission of electricity and electronic communications laid on or beneath the seabed (including cable crossings) between—
(i)any of the wind turbine generators comprised in Work No. 1A(a);
(ii)any of the wind turbine generators comprised in Work No. 1A(a) and any of the works comprised in Work No. 1A(b) or Work No. 1A(c);
(iii)any of the works comprised in Work No. 1A(b) and any of the works comprised in Work No. 1A(c); ...
(iv)the offshore converter platform referred to in Work No. 1A(b)(ii) or a combined platform referred to in Work No. 1A(b) and the export cable route in Work No. 2A; and
(v) any of the offshore platforms comprised in Work No. 1A(b); and
(e)up to 10 vessel moorings situated within the array area consisting of a single floating buoy secured by chain and anchor anchored to the seabed.

---
Source: https://www.legislation.gov.uk/uksi/2015/1592/schedule/1/part/1/paragraph/1 (the official version)
Page: https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015/schedule-1/part-1/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.