Associated development within the meaning of section 115(2) of the 2008 Act comprising—
Work No. 2B – up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid on or beneath the seabed between Work No. 1A(b)(ii) or a combined platform referred to in Work No. 1B(b) and Work No. 3B (including cable crossings) and situated within the co-ordinates of the export cable corridor area specified in the offshore order limits and grid co-ordinates plan.
Project B onshore works
In the Borough of Redcar and Cleveland—
Work No. 3B – up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground between MLWS and MHWS connecting Work No. 2B with Work No. 4B;
Work No. 4B – up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground between Work No. 3B at MHWS and Work No. 5B, including the construction of a haul road and construction access;
Work No. 5B – landfall transition joint bays and trenchless installation drill launch pits together with associated landfill works, construction compound and up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electric communications laid underground, in ducts if necessary, connecting Work No. 4B with Work No. 6B, including the construction of a haul road and construction access;
Work No. 6B – up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary, from Work No. 5B and running in a generally westerly direction for a distance of 7 kilometres to Work No. 7, including the construction of a haul road and construction access;
Work No. 8B – up to 3 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications, laid underground in ducts if necessary from 1 of the electrical converter substations comprised in Work No. 7 and running in a westerly direction for a distance of 2 kilometres to the connection bay within the National Grid substation connection works comprised in Work No. 9, including the construction of a haul road and construction access.
Shared works
Offshore
Work No. 2T – a temporary work area for vessels to carry out intrusive activities during construction, including vessels requiring anchor spreads, alongside the cable corridors.
Onshore
In the Borough of Redcar and Cleveland—
Work No. 7 – up to 2 electrical converter substations and compounds for converting HVDC electricity carried by Work Nos. 6A and 6B to HVAC electricity (including landscaping and the construction of a temporary haul road) and—
(a)up to 4 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary; and
(b)up to 6 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 7L – a screening landform to the south west of Work No. 7;
Work No. 8S – up to 6 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary, from the electrical converter substation comprised in Work No. 7 and running in a westerly direction for a distance of 575 metres to Work Nos. 8A and 8B, including the construction of a haul road and construction access;
Work No. 9 – National Grid substation connection works connecting Work Nos. 8A and 8B to the transmission network and comprising up to 6 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications, including connection bays within the National Grid substation located above ground incorporating isolation switchgear, circuit bay equipment, overhead tubular connectors and switching and measuring equipment located above and below ground;
Work No. 10A – access road from Coast Road (A1085) to provide construction and maintenance access from the public highway to the development site and—
(a)where shared with Work No. 6A, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
(b)where shared with Work No. 6B, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 10B – access road from Redcar Road to provide construction and maintenance access from the public highway to the development site and—
(a)where shared with Work No. 6A, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
(b)where shared with Work No. 6B, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 10C – access from the A174 to provide construction and maintenance access from the public highway to the development site and—
(a)where shared with Work No. 6A, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
(b)where shared with Work No. 6B, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 10D – access road from the A174 to provide construction and maintenance access from the public highway to the development site and
(a)where shared with Work No. 6A, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
(b)where shared with Work No. 6B, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 10E– access road from Grewgrass Lane to provide construction and maintenance access from the public highway to the development site and
(a)where shared with Work No. 6A, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
(b)where shared with Work No. 6B, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 10F – access road from Fishponds Road (B1269) to provide construction and maintenance access from the public highway to the development site and
(a)where shared with Work No. 6A, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
(b)where shared with Work No. 6B, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 10G – access road from Fishponds Road (B1269) to provide construction and maintenance access from the public highway to the development site and—
(a)where shared with Work No. 6A, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
(b)where shared with Work No. 6B, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 10H – access road from the intersection of A174 and A1042 to provide construction and maintenance access from the public highway to the development site and—
(a)where shared with Work No. 6A, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
(b)where shared with Work No. 6B, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 10I – access road to provide construction and maintenance access from the public highway to the development site and—
(a)where shared with Work No. 6A, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
(b)where shared with Work No. 6B, up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 10J – access road to provide construction and maintenance access from the public highway to the development site and—
(a)where shared with Work No. 8A, up to 3 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
(b)where shared with Work No. 8B, up to 3 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary;
Work No. 10K – access road from the public highway High Street (B1380) to provide construction and maintenance access from the public highway to the development site.
In connection with Work Nos. 3A, 4A, 5A, 6A, 7, 7L, 8A, 8S, 9 and 10A to 10K, the undertaker is granted development consent for the further associated development shown on the plans referred to in Requirement 19, or approved pursuant to the Requirements, including—
(a)ramps, means of access and footpaths;
(b)bunds, embankments, swales, landscaping and boundary treatments;
(c)habitat creation;
(d)boreholes;
(e)jointing bays, manholes and other works associated with cable laying including trenchless installation works beneath watercourses roads and other obstructions;
(f)water supply works, foul drainage provision and surface water management systems and culverting;
(g)temporary structures to facilitate the crossing of watercourses including bailey bridges;
(h)construction lay down areas and compounds and their restoration;
(i)works to remove, reconstruct or alter the position of apparatus including mains, sewers, drains, cables and pipelines; and
(j)such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project that fall within the scope of the works assessed by the environmental statement.
In connection with Work Nos. 3B, 4B, 5B, 6B, 7, 7L, 8B, 8S, 9 and 10A to 10K, the undertaker is granted development consent for the further associated development shown on the plans referred to in Requirement 19, or approved pursuant to the Requirements, including—
(a)ramps, means of access and footpaths;
(b)bunds, embankments, swales, landscaping and boundary treatments;
(c)habitat creation;
(d)boreholes;
(e)jointing bays, manholes and other works associated with cable laying including trenchless installation works beneath watercourses roads and other obstructions;
(f)water supply works, foul drainage provision and surface water management systems and culverting;
(g)temporary structures to facilitate the crossing of watercourses including bailey bridges;
(h)construction lay down areas and compounds and their restoration;
(i)works to remove, reconstruct or alter the position of apparatus including mains, sewers, drains, cables and pipelines; and
(j)such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project that fall within the scope of the works assessed by the environmental statement.

---
Source: https://www.legislation.gov.uk/uksi/2015/1592/schedule/1/part/1/paragraph/3 (the official version)
Page: https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015/schedule-1/part-1/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.