{
  "url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015/schedule-1/part-3/paragraph-3",
  "json_url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015/schedule-1/part-3/paragraph-3.json",
  "legislation": "uksi/2015/1592",
  "legislation_title": "The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015",
  "legislation_url": "https://openlegislation.uk/dogger-bank-teesside-a-and-b-offshore-wind-farm-order-2015",
  "path": "schedule/1/part/3/paragraph/3",
  "kind": "paragraph",
  "number": "3",
  "heading": "Detailed offshore design parameters",
  "text": "(1) Within Work No.1A, no wind turbine generator may—\n(a) exceed a height of 315 metres when measured from HAT to the tip of the vertical blade;\n(b) have a rotor diameter exceeding 280 metres;\n(c) be less than a multiple of 6 times the rotor diameter from the nearest wind turbine generator in any direction being not less than 750 metres measured between wind turbine generators;\n(d) have a distance of less than 26 metres between the lowest point of the rotating blade of the wind turbine generator and HAT.\n(1A) Within Work No. 1B, no wind turbine generator may—\n(a) exceed a height of 315 metres when measured from HAT to the tip of the vertical blade;\n(b) have a rotor diameter exceeding 288 metres;\n(c) be less than a multiple of 6 times the rotor diameter from the nearest wind turbine generator in any direction being not less than 750 metres measured between wind turbine generators;\n(d) have a distance of less than 26 metres between the lowest point of the rotating blade of the wind turbine generator and HAT.\n(2) The total rotor-swept area within Work No. 1A must not exceed 4.35 square kilometres.\n(3) The total rotor-swept area within Work No. 1B must not exceed 4.35 square kilometres.\n(4) References to the location of a wind turbine generator are references to the centroid point at the base of the wind turbine generator.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 Pt. 3 para. 3(1) substituted (26.3.2019) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019 (S.I. 2019/669), arts. 1, 5(a)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in Sch. 1 Pt. 3 para. 3(1)(b) substituted (12.8.2020) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2020 (S.I. 2020/851), arts. 1, 4(2)"
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Sch. 1 Pt. 3 para. 3(1A) inserted (26.3.2019) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019 (S.I. 2019/669), arts. 1, 5(b)"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 Pt. 3 para. 3 in force at 26.8.2015, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2015/1592/schedule/1/part/3/paragraph/3",
    "retrieved_at": "2026-10-28T23:33:07.566234+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}