OpenLegislation

Regulation 5 Amendment of regulation 8 (certification requirements)

Original text. Later amendments are not shown.

In regulation 8 (certification requirements), in paragraph (2)—

(a)

before sub-paragraph (a) insert—

“(za)

after scheme closure, a document mentioned in sub-paragraph (a) or a subsequent version or issue of that document approved by the Secretary of State under regulation 2B(1);”;

(b)

in sub-paragraph (a), in the words before paragraph (i), after “date” insert “and before scheme closure”;

(c)

in sub-paragraph (a)(ii)—

(i)

in paragraph (cc), omit “or”;

(ii)

in paragraph (dd), for “2017,” substitute “2017; or”;

(iii)

after paragraph (dd), insert—

“(ee)

Issue 1.0 of the document entitled “Microgeneration Installation Standard: MIS 3005-D The Heat Pump Standard (Design)” published on 1st December 2021f1 and Issue 1.0 of the document entitled “Microgeneration Installation Standard: MIS 3005-I The Heat Pump Standard (Installation)” published on 1st December 2021f2,”;

(iv)

in the words after paragraph (ee), for “it is” substitute “the specified installation standard or standards are”;

(d)

in sub-paragraph (a)(iii)—

(i)

in paragraph (bb), omit “or”;

(ii)

in paragraph (cc), for “2015,” substitute “2015; or”;

(iii)

after paragraph (cc), insert—

“(dd)

Issue 5.0 of the document entitled “Microgeneration Installation Standard: MIS 3001 The Solar Thermal Standard (Installation)” published on 1st December 2021f3,”.

Annotations

Footnotes

f1

Available at www.mcscertified.com.

f2

Available at www.mcscertified.com.

f3

Available at www.mcscertified.com.