# The Dover Harbour Revision Order 2022, Article 3: Power to construct and maintain works


(1) Subject to the provisions of this Order, the Board may in the lines and situations and upon the lands delineated on the deposited plan and within the limits of deviation and according to the levels shown on the deposited section, construct and maintain the works described as follows, together with all necessary works and conveniences connected with, or incidental to it—
A wave wall of steel piled construction 70 metres in length, commencing at a point at 51°07’09.3”N, 1°19’14.2”E proceeding in an easterly direction and terminating at a point at 51°07’08.7”N, 1°19’17.6”E the location and a section of which are shown on the deposited plan and section respectively.
(2) Subject to the provisions of this Order, the Board may, within the limits of deviation, reconstruct, extend, enlarge, replace or relay the works authorised by paragraph (1) and may maintain the same as reconstructed, extended, enlarged, replaced or relaid.

---
Source: https://www.legislation.gov.uk/uksi/2022/709/article/3 (the official version)
Page: https://openlegislation.uk/dover-harbour-revision-order-2022/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.