# The Contracts for Difference (Definition of Eligible Generator) Regulations 2014, Paragraph 2


In paragraph 1(g)(vii), “declared net capacity” means the capacity of electricity generation of a generating station calculated by A-B, where—
“A” means the maximum capacity of electricity generation at which a generating station is able to be operated for a sustained period without damage being caused to it (assuming the source of energy used to generate electricity is available without interruption); and
“B” means the amount of electricity that is consumed by the station whilst operating at such maximum capacity.

---