Article 3 Interpretation
In this Order—
-
“the 2000 Act” means the Freedom of Information Act 2000f1;
-
“account holder” means the public body, undertaking or other person in whose name an account in the Registry is held;
-
“achievement table” has the meaning given by article 75(3);
-
“the Act” means the Climate Change Act 2008;
-
“the administrator” has the meaning given by article 9;
-
“allowance” means a tradeable allowance issued under regulations made by the Treasury under section 21 of the Finance Act 2008f2;
-
“annual report” means the report described in article 49;
-
“annual reporting year” means—
- (a)
in respect of the first phase, each year of that phase;
- (b)
in respect of the second and subsequent phases, the second and subsequent years of that phase;
- (a)
-
“applicant” means—
- (a)
a public body or group of public bodies; or
- (b)
an undertaking or group of undertakings,
required to submit an application for registration as a participant under Part 2 or Schedule 6;
- (a)
-
“authorised supplier” means—
- (a)
- (b)
-
“blocking” has the meaning given by article 105(3);
-
“cancellation account” means the account provided by the administrator into which allowances must be surrendered by a participant in compliance with article 53;
-
“CCA” means a climate change agreement within the meaning given in paragraph 46 of Schedule 6 to the Finance Act 2000f7;
-
“CCA emissions” has the meanings given by paragraph 12(3) of Schedule 5;
-
“CCA facility” means a facility which is subject to a CCA target;
-
“CCA target” means a target in respect of energy use or carbon emissions under a CCA;
-
“CCA target period” means a period referred to as a target period in a CCA or in any rules applicable to a CCA in which a CCA target is to be achieved;
-
“charitable purpose” has the meaning given by—
-
“charge” and “charging” have the meanings given in Part 11;
-
“Chief inspector” means the Chief inspector constituted under regulation 8(3) of the Pollution Prevention and Control Regulations (Northern Ireland) 2003f11;
-
“civil penalty” means a penalty which may be imposed under Part 14;
-
“Community tradeable emissions allowances” has the meaning given by Article 3a of the EU ETS Directive;
-
“compliance account” means the account of a participant from which allowances must be surrendered to the cancellation account in compliance with article 53;
-
“core emissions” has the meaning given by article 42(3);
-
“core supply” means a supply of electricity or gas described in Schedule 2;
-
“CRC” means carbon reduction commitment;
-
“CRC emissions” has the meaning given by article 50(1);
-
“CRC supplies” has the meaning given by article 50(2);
-
“day” means a working day unless provided to the contrary;
-
“daily meter” applies in relation to a supply of gas and has the meaning given by paragraph 7 of Schedule 2;
-
“domestic accommodation” has the meaning given by paragraph 16(3) of Schedule 1;
-
“dynamic supply” means a supply of electricity described in paragraph 5 of Schedule 2;
-
“early action” has the meaning given by paragraph 5(2) of Schedule 8;
-
“electricity generating credit” has the meaning given by article 31(2) but where it applies other than in Part 3, reference to “applicant” in that expression is to be read as a reference to “participant”;
-
“enforcement notice” has the meaning given by article 91;
-
“EU ETS Directive” means Directive 2003/87/EC of the European Parliament and of the Council establishing a scheme for greenhouse gas emission allowance trading within the Community and amending Council Directive 96/61/ECf12, as amended from time to time;
-
“EU ETS emissions” has the meanings given by paragraph 12(2) of Schedule 5;
-
“EU ETS installation” means—
- (a)
an activity or installation within scope of the EU ETS Directive; and
- (b)
any additional activity not included within Annex I of that Directive but approved in the United Kingdom under Article 24,
but not an installation approved as excluded in the United Kingdom under Article 27;
- (a)
-
“exemption CCA target period” has the meaning given by article 29;
-
“footprint emissions” has the meaning given by article 41;
-
“footprint report” has the meaning given by article 39(1)(a);
-
“footprint year” means the first year of each phase;
-
“franchise” and the related expressions, “franchise agreement”, “franchise premises”, “franchisee” and “franchisor” have the meanings given in section 3 of Schedule 1;
-
“fuel” has the meaning given by paragraph 3(3) of Schedule 1;
-
“general CCA exemption” has the meaning given by article 33;
-
“generated and supplied electricity” has the meaning given by article 31(1)(d);
-
“government decision” has the meaning given by paragraph 14 of Schedule 3;
-
“group” has the meaning given by—
- (a)
paragraph 6 of Schedule 3, in respect of public bodies;
- (b)
paragraph 1 of Schedule 4, in respect of undertakings;
- (a)
-
“group CCA exemption” has the meaning given by article 34;
-
“group undertaking” has the meaning given by paragraph 1 of Schedule 4;
-
“highest parent undertaking” has the meaning given by paragraph 1 of Schedule 4;
-
“hourly meter” applies in relation to a supply of gas and has the meaning given by paragraph 8(1) of Schedule 2;
-
“independent college group” has the meaning given by article 21(1)(b)(ii);
-
“kWh” means kilowatt hour or hours;
-
“local authority decision” has the meaning given by paragraph 16 of Schedule 3;
-
“member CCA exemption” has the meaning given by article 32;
-
“MWh” means megawatt hour or hours;
-
“non-settled half hourly meter” applies in relation to a supply of electricity and has the meaning given by paragraph 3(1) of Schedule 2;
-
“participant” means the following registered by the administrator as a participant—
- (a)
a public body or group of public bodies; or
- (b)
an undertaking or group of undertakings,
which carries out a scheme activity; and where a participant is a group, subject to Schedule 6, the participant constitutes the members from time to time of that group;
- (a)
-
“performance table” has the meaning given by article 77(1);
-
“phase” means one of the seven phases of the scheme described in article 2(1);
-
“post-qualification period” has the meaning given by article 27;
-
“premises” means any—
- (a)
land, vehicle or vessel; or
- (b)
plant which is designed to move or be moved whether on roads or otherwise;
- (a)
-
“principal place of activity” means the principal place in the United Kingdom—
- (a)
where the applicant or participant carries on the scheme activity applicable to it; or
- (b)
if an applicant or participant carries on more than one scheme activity, where it carries on the main scheme activity;
- (a)
-
“publication” has the meaning given by article 105(3);
-
“public function” means any activity carried out by a public body;
-
“public body” has the meaning given in section 1 of Schedule 3;
-
“qualification day” means the last day of a qualification year;
-
“qualification criteria” means that—
- (a)
an applicant is supplied with electricity by a settled half hourly meter;
- (b)
qualifying electricity is supplied to it for the purposes of a scheme activity; and
- (c)
the amount of that qualifying electricity satisfies the qualifying amount;
- (a)
-
“qualification year” means—
- (a)
in respect of the first phase, the 2008 calendar year;
- (b)
in respect of the second and subsequent phases, the year immediately before the beginning of the phase;
- (a)
-
“qualifying amount” means 6000 MWh or more;
-
“qualifying electricity” means electricity supplied to a public body or undertaking in accordance with sections 1 to 5 of Schedule 1—
- (a)
measured by a meter described in paragraph 1 of Schedule 2 except a non-domestic meter; or
- (b)
which is a dynamic supply;
- (a)
-
“the Registry” has the meaning given by article 68;
-
“relative change” has the meaning given by paragraph 2 of Schedule 8;
-
“renewables generation” has the meaning given by paragraph 28 of Schedule 1;
-
“residual measurement list” has the meaning given by article 44(4);
-
“residual supplies” has the meaning given by article 44(5);
-
“ROC” means a renewables obligation certificate issued further to an order made under—
-
“scheme” means the trading scheme established by this Order;
-
“scheme activity” means to carry on a business or a public function or an activity which has a charitable purpose;
-
“settled half hourly meter” applies in relation to a supply of electricity and has the meaning given by paragraph 2(1) of Schedule 2;
-
“significant group undertaking” has the meaning given by paragraphs 2 and 4 of Schedule 4;
-
“tCO2” means tonne or tonnes of carbon dioxide;
-
“third party” means a person, other than a participant, for whom the administrator has opened an account in the Registry;
-
“total emissions” has the meaning given by article 30;
-
“transport consumption” has the meaning given by paragraph 19 of Schedule 1;
-
“turnover” means—
- (a)
where a participant is an undertaking or group of undertakings, its turnover as defined in section 474(1) of the Companies Act 2006f15 as if that section—
- (i)
applied to undertakings as defined in this Order; but
- (ii)
did not apply to turnover arising outside the United Kingdom;
or
- (i)
- (b)
where a participant is a public body or group of public bodies, the revenue expenditure of the participant;
- (a)
-
“undertaking” has the meaning given in paragraph 1 of Schedule 4;
-
“unit of turnover” means turnover expressed in pounds sterling rounded up to the nearest pound;
-
“vessel” means, except under paragraph 22 of Schedule 1, any boat or ship;
-
“working day” means 9 am to 5 pm on Mondays to Fridays excluding—
- (a)
bank holidays within the meaning of section 1 of the Banking and Financial Dealings Act 1971f16, including those bank holidays in part only of the United Kingdom;
- (b)
Good Friday; and
- (c)
when it falls on a day that would otherwise be a working day, Christmas Day;
- (a)
-
“year” means (except for the qualification year in respect of the first phase) 1st April to the following 31st March, inclusive of those dates.
Annotations
Footnotes
- f1
- f2
- f3
- f4
- f5
-
1986 c. 44. Section 48(1) is subject to various amendments.
- f6
- f7
- f8
- f9
- f10
- f11
-
S.R. (NI) 2003 No 46, amended by S.I. 2003/496 and 2003/3311; there is another amending instrument which is not relevant.
- f12
-
OJ No L 275, 25.10.03, p. 32. The Directive was amended by: Directive 2004/101/EC (OJ No L 338, 13.11.2004, p. 18); Directive 2008/101/EC (OJ No L 8, 13.1.2009, p. 3); Regulation (EC) No 219/2009 (OJ No L 87, 31.3.2009, p. 109); Directive 2009/29/EC (OJ No L 140, 5.6.2009, p. 63).
- f13
-
1989 c. 29. Section 32 was substituted by, and sections 32A to 32M added by, section 37 of the Energy Act 2008 (c. 32).
- f14
-
S.I. 2003/419 (N.I. 6); Articles 52 to 55F were substituted by the Energy (Amendment) Order (Northern Ireland) 2009 (S.R. (NI) 2009 No 35).
- f15
- f16