{
  "url": "https://openlegislation.uk/draft-domestic-renewable-heat-incentive-scheme-amendment-regulations-2017/regulation-3",
  "json_url": "https://openlegislation.uk/draft-domestic-renewable-heat-incentive-scheme-amendment-regulations-2017/regulation-3.json",
  "legislation": "ukdsi/2017/9780111156353",
  "legislation_title": "The Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2017",
  "legislation_url": "https://openlegislation.uk/draft-domestic-renewable-heat-incentive-scheme-amendment-regulations-2017",
  "path": "regulation/3",
  "kind": "regulation",
  "number": "3",
  "heading": "Amendments to regulation 2 (interpretation)",
  "text": "In regulation 2—\n(a) in the definition of—\n(i) “eligible electricity meter”, in both instances, for “MI-003” substitute “V”;\n(ii) “eligible gas meter”, in both instances, for “MI-002” substitute “IV”;\n(iii) “eligible heat meter”, in both instances, for “MI-004” substitute “VI”;\n(iv) “eligible oil meter”, in both instances, for “MI-005” substitute “VII”;\n(b) for the definition of “heat meter” substitute—\n““heat meter” has the same meaning as that given to “thermal energy meter” in Annex VI to the Measuring Instruments Directive;”;\n(c) in the definition of “initial tariff” after “plant for” insert “all or part of”;\n(d) for the definition of “Measuring Instruments Directive” substitute—\n““Measuring Instruments Directive” means Directive 2014/32/EU of the European Parliament and of the Council on the harmonisation of the laws of the Member States relating to the making available on the market of measuring instruments (recast);”;\n(e) after the definition of “metering and monitoring installer”, insert—\n““metering and monitoring lump sum payment” means a single payment of—\n(a) £700 for a metering and monitoring biomass boiler; or\n(b) £805 for a heat pump which is an accredited domestic plant;”;\n(f) for the definition of “metering and monitoring payment” substitute—\n““metering and monitoring payment” means—\n(a) in respect of a registration given before the second relevant date, one or more payments totalling—\n(i) £200 during a 12 month period for a metering and monitoring biomass boiler; or\n(ii) £230 during a 12 month period for a heat pump which is an accredited domestic plant;\n(b) in respect of a registration given on or after the second relevant date, one or more payments totalling—\n(i) £100 during a 12 month period for a metering and monitoring biomass boiler; or\n(ii) £115 during a 12 month period for a heat pump which is an accredited domestic plant;”;\n(g) after the definition of “metering statement”, insert—\n““MM payments” means a metering and monitoring lump sum payment or metering and monitoring payments, or both;”;\n(h) after the definition of “NOx”, insert—\n““on-board meter” means an electricity meter which is integrated into a heat pump and is able to display the electricity consumption of that heat pump in kWh;”;\n(i) after the definition of “seasonal performance factor”, insert—\n““second relevant date” means the date of coming into force of the Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2017;”; and\n(j) in the definition of “subsequent tariff” after “plant for” insert “all or part of”.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukdsi/2017/9780111156353/regulation/3",
    "retrieved_at": "2026-10-30T15:06:33.880966+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}