Regulation 3 Amendments to regulation 2 (interpretation)
In regulation 2(1)—
after the definition of “assessment date” insert—
““assignment” means an arrangement under which a participant assigns their RHI payments to an NRI;”;
after the definition of “certified installer” insert—
in the definition of “eligible electricity meter”, in both places where it occurs, for “MI-003” substitute “V”;
in the definition of “eligible gas meter”, in both places where it occurs, for “MI-002” substitute “IV”;
in the definition of “eligible heat meter”, in both places where it occurs, for “MI-004” substitute “VI”;
in the definition of “eligible new-build property”, in paragraph (b) after “first occupied was” insert “on or”;
in the definition of “eligible oil meter”, in both places where it occurs, for “MI-005” substitute “VII”;
for the definition of “heat meter” substitute—
““heat meter” has the same meaning as that given to “thermal energy meter” in Annex VI to the Measuring Instruments Directive;”;
after the definition of “installation capacity” insert—
““investor” has the meaning given in regulation 22A(1);
“investor application” means an application made under regulation 22A which has not been withdrawn;
“investor registration” means the entry of an investor’s details on the central register under regulation 22C(2)(a);”;
for the definition of “Measuring Instruments Directive” substitute—
““Measuring Instruments Directive” means Directive 2014/32/EU of the European Parliament and of the Council on the harmonisation of the laws of the Member States relating to the making available on the market of measuring instruments (recast)f3;”;
after the definition of “metering and monitoring installer” insert—
““metering and monitoring lump sum payment” means a single payment of—
- (a)
£700 for a metering and monitoring biomass boiler; or
- (b)
£805 for a heat pump which is an accredited domestic plant;”;
for the definition of “metering and monitoring payment” substitute—
““metering and monitoring payment” means—
- (a)
in respect of a registration given before the third relevant date, one or more payments totalling—
- (i)
£200 during a 12 month period for a metering and monitoring biomass boiler; or
- (ii)
£230 during a 12 month period for a heat pump which is an accredited domestic plant;
- (b)
in respect of a registration given on or after the third relevant date, one or more payments totalling—
- (i)
£100 during a 12 month period for a metering and monitoring biomass boiler; or
- (ii)
£115 during a 12 month period for a heat pump which is an accredited domestic plant;”;
after the definition of “metering statement”, insert—
““MM payments” means a metering and monitoring lump sum payment or metering and monitoring payments, or both;
“NRI” has the meaning given in regulation 22E(3);”;
after the definition of “NOx”, insert—
““on-board meter” means an electricity meter which is integrated into a heat pump and is able to display the electricity consumption of that heat pump in kWh;”;
in the definition of “ongoing obligations”, after “Part 7” insert “or Part 7A, as applicable”;
after the definition of “participant” insert—
““properly made” in relation to an application means—
- (i)
in the case of an application made under regulation 17, an application which provides the information required by regulation 17(2) and (3);
- (ii)
in the case of an application made under regulation 22A, an application which provides the information required by regulation 22A(2); and
- (iii)
in the case of an application made under regulation 50, an application which provides the information required by regulation 50(2);”;
in the definition of “registration”, after “registration” insert “, except in the term “investor registration”,”;
after the definition of “RHPP grant” insert—
““RI” means an investor registered on the central register in accordance with regulation 22C;”;
after the definition of “testing laboratory” insert—
““third relevant date” means the date of coming into force of the Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018f4;”;
after the definition of “type-testing range” insert—
““Unique Registered Investor Reference” has the meaning given in regulation 22C(2)(b)(iii);”.
Annotations
Footnotes
- f1
-
The code of practice can be accessed here: https://www.hiesscheme.org.uk/scheme-rules-code-practice.pdf. Hard copies can be obtained from HIES, Centurion House, Leyland Business Park, Centurion Way, Leyland, PR25 3GR.
- f2
-
The consumer code can be accessed here: https://www.recc.org.uk/scheme/consumer-code. Hard copies can be obtained from Renewable Energy Consumer Code, 80 Strand, London WC2R 0ET.
- f3
-
OJ L 96, 29.3.2014, p149.
- f4
-
S.I. 2018/xxx.