OpenLegislation

Paragraph 2

Original text. Later amendments are not shown.

The information referred to in paragraph 1(b) is—

(a)

the name and address of the testing laboratory by which tests have been carried out;

(b)

the name and signature of the person authorised by the testing laboratory to issue the certificate;

(c)

the date of issue of the certificate together with a certificate reference number;

(d)

the date of the accreditation of the testing laboratory to EN ISO/IEC 17025:2005 and the accreditation number;

(e)

the name, model, manufacturer and installation capacity of the plant tested;

(f)

the date of the testing;

(g)

confirmation that—

(i)

emissions of NOx and PM have been tested on the same occasion;

(ii)

the testing was in accordance with the requirements set out in paragraph 3 or 4; and

(iii)

the test was carried out at no less than 85% of the installation capacity of the plant;

(h)

confirmation that when tested as specified in sub-paragraph (g)—

(i)

emissions of PM from the plant did not exceed 30 grams of PM per gigajoule net heat input; and

(ii)

emissions of NOx did not exceed 150 grams of NOx per gigajoule net heat input;

(i)

the actual emissions of PM and NOx measured when the plant was tested as specified in sub-paragraph (g);

(j)

a list of—

(i)

the types of fuel used during the testing; and

(ii)

the types of fuel which can be used so as to ensure that the emission limits referred to in sub-paragraph (h) are not exceeded;

(k)

the moisture content of the fuel used during testing and the maximum moisture content which can be used so as to ensure that the emission limits referred to in sub-paragraph (h) are not exceeded;

(l)

a statement indicating whether or not the plant tested was a manually stoked natural draught plant;

(m)

a list of plants, other than the plant tested, in the type-testing range of plants for the certificate, if any.