Regulation 7 Calculations involving months
(1)
Where a day (“day 1”) is described as falling a specified number of months before or after another day (“day 2”), the date of day 1 is to be determined as follows.
(2)
Count backwards or forwards (as the case may be) the specified number of months from the month in which day 2 falls.
(3)
If the month arrived at in accordance with paragraph (2) has a day corresponding to day 2, day 1 is that day of the month arrived at.
Annotations
Footnotes
- f1
-
For example, if a child is born on 31st August, the day falling 6 months after the day the child is born is 28th February (or 29th February in a leap year).