Schedule 2 QUALIFYING ACTIONS
A qualifying action is the provision of—
(a)
cavity wall insulation;
(b)
a connection to a district heating scheme;
(c)
a district heating meter for individual house billing;
(d)
draught-proofing;
(e)
external solid wall insulation;
(f)
flat roof insulation;
(g)
fuel switching;
(h)
glazing;
(i)
heating controls when provided with a new heating system;
(j)
a heat pump;
(k)
a home energy advice package;
(l)
internal solid wall insulation;
(m)
loft insulation;
(n)
microgeneration measures other than a heat pump;
(o)
a replacement boiler;
(p)
under-floor insulation; or
(q)
an upgrade of a district heating system.