# The Electricity and Gas (Energy Company Obligation) Order 2014, Paragraph 1


The following table has effect for the purpose of determining the relevant conversion factor for a measure under article 29(3)(a)—
Measure
Conversion factor
A measure to improve the insulating properties of non-gas fuelled premises
1.35
Repair of a qualifying boiler at non-gas fuelled premises
1.45
Replacement of a boiler—
0.95
(a)
which was not a qualifying boiler; and
(b)
by a boiler which was not accompanied at the time installation was completed by a qualifying warranty
Replacement of a qualifying boiler by another boiler—
0.75
(a)
where both the boiler being replaced and the replacement boiler were fuelled by mains gas; and
(b)
the replacement boiler was not accompanied at the time installation was completed by a qualifying warranty
Replacement of a qualifying boiler by another boiler—
0.8
(a)
where both the boiler being replaced and the replacement boiler were fuelled by mains gas; and
(b)
the replacement boiler was accompanied at the time installation was completed by a qualifying warranty
Replacement of a qualifying boiler—
1.4
(a)
at non-gas fuelled premises; and
(b)
by a boiler which was not accompanied at the time installation was completed by a qualifying warranty
Replacement of a qualifying boiler—
1.45
(a)
at non-gas fuelled premises; and
(b)
by—
(i)
a boiler which was accompanied at the time installation was completed by a qualifying warranty; or
(ii)
a measure other than a boiler or an electric storage heater

---
Source: https://www.legislation.gov.uk/ukdsi/2014/9780111122297/schedule/5/paragraph/1 (the official version)
Page: https://openlegislation.uk/draft-electricity-and-gas-energy-company-obligation-order-2014/schedule-5/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

