{
  "url": "https://openlegislation.uk/draft-electricity-and-gas-energy-company-obligation-order-2022/article-11",
  "json_url": "https://openlegislation.uk/draft-electricity-and-gas-energy-company-obligation-order-2022/article-11.json",
  "legislation": "ukdsi/2022/9780348236606",
  "legislation_title": "The Electricity and Gas (Energy Company Obligation) Order 2022",
  "legislation_url": "https://openlegislation.uk/draft-electricity-and-gas-energy-company-obligation-order-2022",
  "path": "article/11",
  "kind": "article",
  "number": "11",
  "heading": "Qualifying actions: overview",
  "text": "(1) A qualifying action is a measure which satisfies Condition A, B or C in this article.\n(2) Condition A is that the Administrator is satisfied that the measure—\n(a) meets the requirements of article 12 (general requirements);\n(b) meets the condition—\n(i) in any one of articles 13 to 21 (ECO4 project measures); or\n(ii) in article 22 or 23 (in-fill measures);\n(c) where it is a heating measure—\n(i) other than where it is a measure falling within sub-paragraph (b)(ii), meets the minimum insulation requirement in article 24 or 25; and\n(ii) meets the requirements of article 26 (additional requirements to be met by heating measures);\n(d) meets the requirements of article 31 (installation standards, consumer protection and smart meter advice); and\n(e) is notified to the Administrator in accordance with article 43.\n(3) Condition B (which relates to ECO3 interim delivery actions) is that the Administrator is satisfied that the measure—\n(a) is completed on or after 1st April 2022 and before 1st July 2022;\n(b) meets the requirements set out in article 13(1)(a), (b), (d), (e) and (g) of the 2018 Order;\n(c) meets the requirements of article 31(1)(b) or (c);\n(d) is not—\n(i) a demonstration action;\n(ii) the installation of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas, unless the measure is a repair;\n(iii) the installation of a connection to a district heating system that delivers heat generated wholly or partly from biofuel, oil or liquefied petroleum gas; or\n(iv) a repair other than—\n(aa) a repair of a renewable heating system;\n(bb) a repair of an efficient boiler or an efficient electric storage heater; or\n(cc) a repair of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas; and\n(e) is notified to the Administrator in accordance with article 43.\n(4) Condition C is that the measure is a surplus action.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukdsi/2022/9780348236606/article/11",
    "retrieved_at": "2026-10-30T14:45:17.688479+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}