# The Electricity and Gas (Energy Company Obligation) Order 2022, Article 11: Qualifying actions: overview


(1) A qualifying action is a measure which satisfies Condition A, B or C in this article.
(2) Condition A is that the Administrator is satisfied that the measure—
(a) meets the requirements of article 12 (general requirements);
(b) meets the condition—
(i) in any one of articles 13 to 21 (ECO4 project measures); or
(ii) in article 22 or 23 (in-fill measures);
(c) where it is a heating measure—
(i) other than where it is a measure falling within sub-paragraph (b)(ii), meets the minimum insulation requirement in article 24 or 25; and
(ii) meets the requirements of article 26 (additional requirements to be met by heating measures);
(d) meets the requirements of article 31 (installation standards, consumer protection and smart meter advice); and
(e) is notified to the Administrator in accordance with article 43.
(3) Condition B (which relates to ECO3 interim delivery actions) is that the Administrator is satisfied that the measure—
(a) is completed on or after 1st April 2022 and before 1st July 2022;
(b) meets the requirements set out in article 13(1)(a), (b), (d), (e) and (g) of the 2018 Order;
(c) meets the requirements of article 31(1)(b) or (c);
(d) is not—
(i) a demonstration action;
(ii) the installation of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas, unless the measure is a repair;
(iii) the installation of a connection to a district heating system that delivers heat generated wholly or partly from biofuel, oil or liquefied petroleum gas; or
(iv) a repair other than—
(aa) a repair of a renewable heating system;
(bb) a repair of an efficient boiler or an efficient electric storage heater; or
(cc) a repair of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas; and
(e) is notified to the Administrator in accordance with article 43.
(4) Condition C is that the measure is a surplus action.

---
Source: https://www.legislation.gov.uk/ukdsi/2022/9780348236606/article/11 (the official version)
Page: https://openlegislation.uk/draft-electricity-and-gas-energy-company-obligation-order-2022/article-11
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

